YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Construction Equipment Management Practices for Improving Labor Productivity in Multistory Building Construction Projects

    Source: Journal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 010
    Author:
    Argaw Tarekegn Gurmu
    ,
    Ajibade Ayodeji Aibinu
    DOI: 10.1061/(ASCE)CO.1943-7862.0001384
    Publisher: American Society of Civil Engineers
    Abstract: Construction project productivity can be enhanced by the implementation of good management practices. The purposes of this research are to identify construction equipment management practices that have the potential to improve productivity in multistory building projects, develop a tool for measuring such practices, and on that basis, build a logistic regression model for predicting the probability of exceeding a baseline productivity factor when the levels of implementation of equipment management practices are known. The research adopted a two-phase exploratory sequential mixed-methods design. During Phase I, in-depth interviews were conducted with 19 experts who have been involved in the delivery of multistory building projects. The qualitative data were analyzed, and construction equipment management practices that have the potential to improve productivity were identified. In Phase II, data were collected from 39 principal contractors on 39 projects using questionnaires. The quantitative data were analyzed to prioritize the practices identified in Phase I, and on that basis, a scoring tool for measuring the practices was developed; a logistic regression model was also developed for predicting the probability of exceeding baseline productivity factor using a sigmoid graph when the score of the practices is known. Construction equipment maintenance, construction equipment procurement plans, and construction equipment productivity analysis are identified as the three construction equipment management practices that could improve productivity in multistory building projects. Contractors can use the probability-based predictive model to assess the risk of low productivity for specific levels of implementations of construction equipment management practices. This research contributes to the body of knowledge by developing a construction equipment management practices measuring, planning, monitoring, and evaluating tool in the context of multistory building projects. Also, the logistic regression model can be used to test whether a certain level of implementation of a construction equipment management practice might be associated with higher or lower productivity compared to the baseline.
    • Download: (318.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Construction Equipment Management Practices for Improving Labor Productivity in Multistory Building Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4241146
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorArgaw Tarekegn Gurmu
    contributor authorAjibade Ayodeji Aibinu
    date accessioned2017-12-16T09:18:11Z
    date available2017-12-16T09:18:11Z
    date issued2017
    identifier other%28ASCE%29CO.1943-7862.0001384.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4241146
    description abstractConstruction project productivity can be enhanced by the implementation of good management practices. The purposes of this research are to identify construction equipment management practices that have the potential to improve productivity in multistory building projects, develop a tool for measuring such practices, and on that basis, build a logistic regression model for predicting the probability of exceeding a baseline productivity factor when the levels of implementation of equipment management practices are known. The research adopted a two-phase exploratory sequential mixed-methods design. During Phase I, in-depth interviews were conducted with 19 experts who have been involved in the delivery of multistory building projects. The qualitative data were analyzed, and construction equipment management practices that have the potential to improve productivity were identified. In Phase II, data were collected from 39 principal contractors on 39 projects using questionnaires. The quantitative data were analyzed to prioritize the practices identified in Phase I, and on that basis, a scoring tool for measuring the practices was developed; a logistic regression model was also developed for predicting the probability of exceeding baseline productivity factor using a sigmoid graph when the score of the practices is known. Construction equipment maintenance, construction equipment procurement plans, and construction equipment productivity analysis are identified as the three construction equipment management practices that could improve productivity in multistory building projects. Contractors can use the probability-based predictive model to assess the risk of low productivity for specific levels of implementations of construction equipment management practices. This research contributes to the body of knowledge by developing a construction equipment management practices measuring, planning, monitoring, and evaluating tool in the context of multistory building projects. Also, the logistic regression model can be used to test whether a certain level of implementation of a construction equipment management practice might be associated with higher or lower productivity compared to the baseline.
    publisherAmerican Society of Civil Engineers
    titleConstruction Equipment Management Practices for Improving Labor Productivity in Multistory Building Construction Projects
    typeJournal Paper
    journal volume143
    journal issue10
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001384
    treeJournal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 010
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian