YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Asset Data Handover for a Large Educational Institution: Case-Study Approach

    Source: Journal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 011
    Author:
    Walid Thabet
    ,
    Jason Lucas
    DOI: 10.1061/(ASCE)CO.1943-7862.0001389
    Publisher: American Society of Civil Engineers
    Abstract: Owners of multiple facilities who maintain large capital portfolios are challenged with efficient maintenance to streamline operational processes and costs. Clearly defined and structured information documentation standards are needed before a project even starts to develop appropriate as-built documentation to support postconstruction operations. This paper documents a case study of a large educational institution that is exploring methods for adopting a building information model (BIM) for facility management (FM) approach for information management as a way to overcome inefficiencies in its current information processing methods. A multiphase process has been used in the development of a proposed BIM-based solution. This paper presents the data needs analysis that has been conducted with the first phase of the research project. The preliminary data capture and documentation methods are discussed in terms of a spreadsheet-based methodology that allows for easily identifying and tracking sources of information. A pilot study is also discussed that was used to validate the information needs and overall process. Future research steps of converting the spreadsheet-based methodology into a model-based approach allowing the FM department to directly link a BIM to its computerized maintenance and management system (CMMS) are also included. Specific challenges and lessons learned in the information collection process are also discussed in terms of how they have affected the overall process development.
    • Download: (1.438Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Asset Data Handover for a Large Educational Institution: Case-Study Approach

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4241141
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorWalid Thabet
    contributor authorJason Lucas
    date accessioned2017-12-16T09:18:09Z
    date available2017-12-16T09:18:09Z
    date issued2017
    identifier other%28ASCE%29CO.1943-7862.0001389.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4241141
    description abstractOwners of multiple facilities who maintain large capital portfolios are challenged with efficient maintenance to streamline operational processes and costs. Clearly defined and structured information documentation standards are needed before a project even starts to develop appropriate as-built documentation to support postconstruction operations. This paper documents a case study of a large educational institution that is exploring methods for adopting a building information model (BIM) for facility management (FM) approach for information management as a way to overcome inefficiencies in its current information processing methods. A multiphase process has been used in the development of a proposed BIM-based solution. This paper presents the data needs analysis that has been conducted with the first phase of the research project. The preliminary data capture and documentation methods are discussed in terms of a spreadsheet-based methodology that allows for easily identifying and tracking sources of information. A pilot study is also discussed that was used to validate the information needs and overall process. Future research steps of converting the spreadsheet-based methodology into a model-based approach allowing the FM department to directly link a BIM to its computerized maintenance and management system (CMMS) are also included. Specific challenges and lessons learned in the information collection process are also discussed in terms of how they have affected the overall process development.
    publisherAmerican Society of Civil Engineers
    titleAsset Data Handover for a Large Educational Institution: Case-Study Approach
    typeJournal Paper
    journal volume143
    journal issue11
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001389
    treeJournal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 011
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian