YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Estimating Construction Labor Productivity Frontier: Pilot Study

    Source: Journal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 010
    Author:
    Nirajan Mani
    ,
    Krishna P. Kisi
    ,
    Eddy M. Rojas
    ,
    E. Terence Foster
    DOI: 10.1061/(ASCE)CO.1943-7862.0001390
    Publisher: American Society of Civil Engineers
    Abstract: Existing practice compares actual productivity with historical data to gauge construction operation efficiency. However, this practice is accurate only if historical data reflect optimal values—generally, such comparisons manifest only relative rather than absolute efficiency. Therefore, in order to determine absolute efficiency, one must compare actual versus optimal productivity. Optimal productivity is the highest sustainable productivity level achievable under “good management” and “typical field conditions.” Perfect conditions, though unattainable in the field, conceptually yield the theoretical maximum level of productivity, known as the “productivity frontier.” The productivity frontier is a construct that enables the estimation of the optimal productivity of construction operations. This research contributes to the body of knowledge by introducing a novel framework for estimating the labor productivity frontier and applying this framework to a pilot study that tests the feasibility of this framework against a single-worker, labor-intensive, sequential construction task. This paper first reviews relevant literature, then presents the theoretical underpinnings of the framework for estimating the productivity frontier in the construction domain, examines the data from the pilot study, and evaluates the feasibility of the proposed framework. By following two approaches—observed durations and statistically estimated durations—this study demonstrates the functionality of this framework by computing that the productivity frontier of the pilot study is 22.32 stations per hour.
    • Download: (550.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Estimating Construction Labor Productivity Frontier: Pilot Study

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4241139
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorNirajan Mani
    contributor authorKrishna P. Kisi
    contributor authorEddy M. Rojas
    contributor authorE. Terence Foster
    date accessioned2017-12-16T09:18:09Z
    date available2017-12-16T09:18:09Z
    date issued2017
    identifier other%28ASCE%29CO.1943-7862.0001390.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4241139
    description abstractExisting practice compares actual productivity with historical data to gauge construction operation efficiency. However, this practice is accurate only if historical data reflect optimal values—generally, such comparisons manifest only relative rather than absolute efficiency. Therefore, in order to determine absolute efficiency, one must compare actual versus optimal productivity. Optimal productivity is the highest sustainable productivity level achievable under “good management” and “typical field conditions.” Perfect conditions, though unattainable in the field, conceptually yield the theoretical maximum level of productivity, known as the “productivity frontier.” The productivity frontier is a construct that enables the estimation of the optimal productivity of construction operations. This research contributes to the body of knowledge by introducing a novel framework for estimating the labor productivity frontier and applying this framework to a pilot study that tests the feasibility of this framework against a single-worker, labor-intensive, sequential construction task. This paper first reviews relevant literature, then presents the theoretical underpinnings of the framework for estimating the productivity frontier in the construction domain, examines the data from the pilot study, and evaluates the feasibility of the proposed framework. By following two approaches—observed durations and statistically estimated durations—this study demonstrates the functionality of this framework by computing that the productivity frontier of the pilot study is 22.32 stations per hour.
    publisherAmerican Society of Civil Engineers
    titleEstimating Construction Labor Productivity Frontier: Pilot Study
    typeJournal Paper
    journal volume143
    journal issue10
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001390
    treeJournal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 010
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian