YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Battle of Water Networks DMAs: Multistage Design Approach

    Source: Journal of Water Resources Planning and Management:;2017:;Volume ( 143 ):;issue: 010
    Author:
    Elad Salomons
    ,
    Olya Skulovich
    ,
    Avi Ostfeld
    DOI: 10.1061/(ASCE)WR.1943-5452.0000830
    Publisher: American Society of Civil Engineers
    Abstract: Looped water distribution system (WDS) repartitioning to district metering areas (DMAs) gained popularity as an effective technique to manage the system and detect and reduce system leakages. However, to apply this method to real WDS, various system properties should be taken into account to ensure efficient water supply. The battle of water networks district meter areas (BWNDMA) is a challenging problem that requires the redesign of the E-Town city network in Colombia. The water utility is looking to repartition the network into manageable DMAs while supplying future demands, keeping minimum and maximum pressures, improving water quality, operating the network at uniform low pressures, balancing water sources, and meeting their seasonal production capabilities. The problem is stated as a multiobjective optimization problem with DMA partitioning being one of eight equal-weighted objectives. They may be reached by (1) closing, opening, or replacing existing pipes, (2) adding parallel pipes, (3) managing storage tanks, pressure valves, and flow-control valves, and (4) utilizing pumps in the dry season. With no known analytical methodology to optimize such a large mixed-integer nonlinear problem, a major difficulty is to find a feasible solution; therefore, a multistage classic engineering approach was taken. First, source allocation and general design were carried out for the operational zones. Then, tank volumes were adjusted to meet their constraints. At this stage, DMAs were introduced to meet pressure regulations. Finally, detailed design and fine-tuning of the operations were carried out. This paper describes the taken procedures and obtained results for the redesign of the E-Town network.
    • Download: (1.072Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Battle of Water Networks DMAs: Multistage Design Approach

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4241063
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorElad Salomons
    contributor authorOlya Skulovich
    contributor authorAvi Ostfeld
    date accessioned2017-12-16T09:17:37Z
    date available2017-12-16T09:17:37Z
    date issued2017
    identifier other%28ASCE%29WR.1943-5452.0000830.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4241063
    description abstractLooped water distribution system (WDS) repartitioning to district metering areas (DMAs) gained popularity as an effective technique to manage the system and detect and reduce system leakages. However, to apply this method to real WDS, various system properties should be taken into account to ensure efficient water supply. The battle of water networks district meter areas (BWNDMA) is a challenging problem that requires the redesign of the E-Town city network in Colombia. The water utility is looking to repartition the network into manageable DMAs while supplying future demands, keeping minimum and maximum pressures, improving water quality, operating the network at uniform low pressures, balancing water sources, and meeting their seasonal production capabilities. The problem is stated as a multiobjective optimization problem with DMA partitioning being one of eight equal-weighted objectives. They may be reached by (1) closing, opening, or replacing existing pipes, (2) adding parallel pipes, (3) managing storage tanks, pressure valves, and flow-control valves, and (4) utilizing pumps in the dry season. With no known analytical methodology to optimize such a large mixed-integer nonlinear problem, a major difficulty is to find a feasible solution; therefore, a multistage classic engineering approach was taken. First, source allocation and general design were carried out for the operational zones. Then, tank volumes were adjusted to meet their constraints. At this stage, DMAs were introduced to meet pressure regulations. Finally, detailed design and fine-tuning of the operations were carried out. This paper describes the taken procedures and obtained results for the redesign of the E-Town network.
    publisherAmerican Society of Civil Engineers
    titleBattle of Water Networks DMAs: Multistage Design Approach
    typeJournal Paper
    journal volume143
    journal issue10
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)WR.1943-5452.0000830
    treeJournal of Water Resources Planning and Management:;2017:;Volume ( 143 ):;issue: 010
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian