YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    A Quadratic Programming Approach for Fixed Head Hydropower System Operation Optimization Considering Power Shortage Aspect

    Source: Journal of Water Resources Planning and Management:;2017:;Volume ( 143 ):;issue: 010
    Author:
    Zhong-kai Feng
    ,
    Wen-jing Niu
    ,
    Chun-tian Cheng
    DOI: 10.1061/(ASCE)WR.1943-5452.0000838
    Publisher: American Society of Civil Engineers
    Abstract: As an important renewable energy resource, hydropower plays an irreplaceable role in reducing power shortages in modern electrical systems throughout the world. This study focuses on the fixed head hydropower operation problem considering power shortages, which is classified as a large-scale nonlinear constrained optimization problem with a set of complex operational constraints. In order to efficiently solve this problem, a novel quadratic programming (QP) model is developed, in which the goal is to find the optimal hourly operational policy for all hydropower plants in a system so as to minimize the sum of squared energy deficits over the scheduling horizon. The results of a ten-reservoir hydropower system show that the proposed approach can efficiently find better solutions than several previous optimization methods for energy deficit reduction. Thus the proposed technique is effective for hydropower scheduling problems in which the assumption of fixed hydraulic head holds.
    • Download: (408.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      A Quadratic Programming Approach for Fixed Head Hydropower System Operation Optimization Considering Power Shortage Aspect

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4240985
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorZhong-kai Feng
    contributor authorWen-jing Niu
    contributor authorChun-tian Cheng
    date accessioned2017-12-16T09:17:15Z
    date available2017-12-16T09:17:15Z
    date issued2017
    identifier other%28ASCE%29WR.1943-5452.0000838.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4240985
    description abstractAs an important renewable energy resource, hydropower plays an irreplaceable role in reducing power shortages in modern electrical systems throughout the world. This study focuses on the fixed head hydropower operation problem considering power shortages, which is classified as a large-scale nonlinear constrained optimization problem with a set of complex operational constraints. In order to efficiently solve this problem, a novel quadratic programming (QP) model is developed, in which the goal is to find the optimal hourly operational policy for all hydropower plants in a system so as to minimize the sum of squared energy deficits over the scheduling horizon. The results of a ten-reservoir hydropower system show that the proposed approach can efficiently find better solutions than several previous optimization methods for energy deficit reduction. Thus the proposed technique is effective for hydropower scheduling problems in which the assumption of fixed hydraulic head holds.
    publisherAmerican Society of Civil Engineers
    titleA Quadratic Programming Approach for Fixed Head Hydropower System Operation Optimization Considering Power Shortage Aspect
    typeJournal Paper
    journal volume143
    journal issue10
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)WR.1943-5452.0000838
    treeJournal of Water Resources Planning and Management:;2017:;Volume ( 143 ):;issue: 010
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian