YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    A Fuzzy-Based Evaluation of Financial Risks in Build–Own–Operate–Transfer Water Supply Projects

    Source: Journal of Infrastructure Systems:;2017:;Volume ( 023 ):;issue: 004
    Author:
    Ernest E. Ameyaw
    ,
    Albert P. C. Chan
    ,
    De-Graft Owusu-Manu
    ,
    David J. Edwards
    ,
    Frederick Dartey
    DOI: 10.1061/(ASCE)IS.1943-555X.0000390
    Publisher: American Society of Civil Engineers
    Abstract: The build–own–operate–transfer (BOOT) scheme is widely used for the provision of new bulk water supply. However, this scheme is complex and carries significant financial risks because of the characteristics of the water sector and the involvement of public-private stakeholders with new and extended responsibilities, large private capital, and long contract duration. Drawing on the Nungua Seawater Desalination Plant (NSDP) in Ghana, this study seeks to identify and assess the critical financial risks associated with BOOT water supply projects and evaluate the financial risk level of the NSDP project. The risks and their relative criticality on the NSDP project are investigated by using a questionnaire survey method. The questionnaire was formulated with a set of 18 risks derived from extant literature and project documentation. Perceived critical financial risks affecting the NSDP project were assessed by a team of experts who had direct involvement in the project. A fuzzy synthetic evaluation suggests that the project is financially risky and that all the risks are critical to the project. Bankruptcy of consortium members, unfavorable economy of the host country, uncertainty in tariff adjustment of water products, rate of return restrictions, and availability problem of private capital are the five most highly-ranked risks. The fuzzy technique is used to represent and model experiential knowledge of the survey participants and to address the fuzziness of their expert judgments. The study’s results facilitate prioritization of risks and a comprehensive risk management program during the lifecycle of the case project and future projects. The fuzzy technique is suitable for early phases of BOOT projects to prioritize the risks that require a detailed analysis and to predict the risk level of a project.
    • Download: (610.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      A Fuzzy-Based Evaluation of Financial Risks in Build–Own–Operate–Transfer Water Supply Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4238436
    Collections
    • Journal of Infrastructure Systems

    Show full item record

    contributor authorErnest E. Ameyaw
    contributor authorAlbert P. C. Chan
    contributor authorDe-Graft Owusu-Manu
    contributor authorDavid J. Edwards
    contributor authorFrederick Dartey
    date accessioned2017-12-16T09:05:40Z
    date available2017-12-16T09:05:40Z
    date issued2017
    identifier other%28ASCE%29IS.1943-555X.0000390.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4238436
    description abstractThe build–own–operate–transfer (BOOT) scheme is widely used for the provision of new bulk water supply. However, this scheme is complex and carries significant financial risks because of the characteristics of the water sector and the involvement of public-private stakeholders with new and extended responsibilities, large private capital, and long contract duration. Drawing on the Nungua Seawater Desalination Plant (NSDP) in Ghana, this study seeks to identify and assess the critical financial risks associated with BOOT water supply projects and evaluate the financial risk level of the NSDP project. The risks and their relative criticality on the NSDP project are investigated by using a questionnaire survey method. The questionnaire was formulated with a set of 18 risks derived from extant literature and project documentation. Perceived critical financial risks affecting the NSDP project were assessed by a team of experts who had direct involvement in the project. A fuzzy synthetic evaluation suggests that the project is financially risky and that all the risks are critical to the project. Bankruptcy of consortium members, unfavorable economy of the host country, uncertainty in tariff adjustment of water products, rate of return restrictions, and availability problem of private capital are the five most highly-ranked risks. The fuzzy technique is used to represent and model experiential knowledge of the survey participants and to address the fuzziness of their expert judgments. The study’s results facilitate prioritization of risks and a comprehensive risk management program during the lifecycle of the case project and future projects. The fuzzy technique is suitable for early phases of BOOT projects to prioritize the risks that require a detailed analysis and to predict the risk level of a project.
    publisherAmerican Society of Civil Engineers
    titleA Fuzzy-Based Evaluation of Financial Risks in Build–Own–Operate–Transfer Water Supply Projects
    typeJournal Paper
    journal volume23
    journal issue4
    journal titleJournal of Infrastructure Systems
    identifier doi10.1061/(ASCE)IS.1943-555X.0000390
    treeJournal of Infrastructure Systems:;2017:;Volume ( 023 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian