YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Causes of Road and Bridge Construction Claims: Analysis of Colorado Department of Transportation Projects

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2015:;Volume ( 007 ):;issue: 002
    Author:
    Mohammed S. Hashem M. Mehany
    ,
    Neil Grigg
    DOI: 10.1061/(ASCE)LA.1943-4170.0000162
    Publisher: American Society of Civil Engineers
    Abstract: Road and highway construction projects are plagued by unanticipated conditions and changes, which cause claims and cost overruns due to diverse causes. This study identified a set of project factors that might affect the rate of claim occurrence in different projects and used data from Colorado Department of Transportation projects to test the potential causes of claims to assess which project management attributes are most likely to lead to claims. A total of 780 projects were selected from a data set of 1,060 projects completed in a time window from 1997 to 2012. These showed 213 claims within a subset of 62 claim-contained projects. Results showed that delays are the main cause of claims in the projects studied and are more important than the effects of added items and change orders. The study also showed that projects with fixed completion date schedules are more susceptible to claims than projects with more flexible schedules. Actions indicated are for transportation project planners to adopt detailed approved schedules and seek accurate time estimates prior to bidding, to create comprehensive delay claim management systems, and to seek to resolve claims at the lowest management levels. The analysis also indicated that fixed-date completion schedules apply pressure on contractors and owners and can incentivize claims.
    • Download: (389.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Causes of Road and Bridge Construction Claims: Analysis of Colorado Department of Transportation Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4238428
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorMohammed S. Hashem M. Mehany
    contributor authorNeil Grigg
    date accessioned2017-12-16T09:05:38Z
    date available2017-12-16T09:05:38Z
    date issued2015
    identifier other%28ASCE%29LA.1943-4170.0000162.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4238428
    description abstractRoad and highway construction projects are plagued by unanticipated conditions and changes, which cause claims and cost overruns due to diverse causes. This study identified a set of project factors that might affect the rate of claim occurrence in different projects and used data from Colorado Department of Transportation projects to test the potential causes of claims to assess which project management attributes are most likely to lead to claims. A total of 780 projects were selected from a data set of 1,060 projects completed in a time window from 1997 to 2012. These showed 213 claims within a subset of 62 claim-contained projects. Results showed that delays are the main cause of claims in the projects studied and are more important than the effects of added items and change orders. The study also showed that projects with fixed completion date schedules are more susceptible to claims than projects with more flexible schedules. Actions indicated are for transportation project planners to adopt detailed approved schedules and seek accurate time estimates prior to bidding, to create comprehensive delay claim management systems, and to seek to resolve claims at the lowest management levels. The analysis also indicated that fixed-date completion schedules apply pressure on contractors and owners and can incentivize claims.
    publisherAmerican Society of Civil Engineers
    titleCauses of Road and Bridge Construction Claims: Analysis of Colorado Department of Transportation Projects
    typeJournal Paper
    journal volume7
    journal issue2
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000162
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2015:;Volume ( 007 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian