YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Hybrid Optimization Method for Large-Scale Multimode Resource-Constrained Project Scheduling Problem

    Source: Journal of Management in Engineering:;2016:;Volume ( 032 ):;issue: 006
    Author:
    Rifat Sonmez
    ,
    Mustafa Gürel
    DOI: 10.1061/(ASCE)ME.1943-5479.0000468
    Publisher: American Society of Civil Engineers
    Abstract: Despite many research efforts that have focused on the multimode resource-constrained project scheduling problem (MRCPSP), very little success has been achieved in solving the problem for large-scale projects. In this paper a new hybrid optimization method is presented to achieve an advancement in optimal planning and scheduling of large-scale construction projects with multiple duration/resource execution modes and resource constraints. The proposed method consists of a novel heuristic and unique genetic optimization algorithm. The heuristic is designed to achieve schedules with efficient resource utilizations through dynamic selection of modes. A genetic optimization algorithm is integrated to the proposed optimization method to further improve the quality of the solutions obtained in the heuristic phase. The computational experiment results reveal that the new hybrid method outperforms the state-of-the-art methods and achieves high-quality solutions in significantly less computation time, especially for large projects. The main contribution of the proposed hybrid optimization method is that it enables significant savings by optimal planning and scheduling of medium- and large-scale construction projects with multiple duration/resource execution modes and resource constraints.
    • Download: (353.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Hybrid Optimization Method for Large-Scale Multimode Resource-Constrained Project Scheduling Problem

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4238296
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorRifat Sonmez
    contributor authorMustafa Gürel
    date accessioned2017-12-16T09:05:11Z
    date available2017-12-16T09:05:11Z
    date issued2016
    identifier other%28ASCE%29ME.1943-5479.0000468.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4238296
    description abstractDespite many research efforts that have focused on the multimode resource-constrained project scheduling problem (MRCPSP), very little success has been achieved in solving the problem for large-scale projects. In this paper a new hybrid optimization method is presented to achieve an advancement in optimal planning and scheduling of large-scale construction projects with multiple duration/resource execution modes and resource constraints. The proposed method consists of a novel heuristic and unique genetic optimization algorithm. The heuristic is designed to achieve schedules with efficient resource utilizations through dynamic selection of modes. A genetic optimization algorithm is integrated to the proposed optimization method to further improve the quality of the solutions obtained in the heuristic phase. The computational experiment results reveal that the new hybrid method outperforms the state-of-the-art methods and achieves high-quality solutions in significantly less computation time, especially for large projects. The main contribution of the proposed hybrid optimization method is that it enables significant savings by optimal planning and scheduling of medium- and large-scale construction projects with multiple duration/resource execution modes and resource constraints.
    publisherAmerican Society of Civil Engineers
    titleHybrid Optimization Method for Large-Scale Multimode Resource-Constrained Project Scheduling Problem
    typeJournal Paper
    journal volume32
    journal issue6
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000468
    treeJournal of Management in Engineering:;2016:;Volume ( 032 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian