YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Stakeholder Management in Long-Term Complex Megaconstruction Projects: The Saemangeum Project

    Source: Journal of Management in Engineering:;2017:;Volume ( 033 ):;issue: 004
    Author:
    Hyoungbae Park
    ,
    Kyeongseok Kim
    ,
    Yong-Woo Kim
    ,
    Hyoungkwan Kim
    DOI: 10.1061/(ASCE)ME.1943-5479.0000515
    Publisher: American Society of Civil Engineers
    Abstract: This paper identifies 31 critical success factors (CSFs) and suggests a framework for effective stakeholder management in long-term complex megaconstruction (LCM) projects that require more than 10 years for multipurpose development. The results of a survey on the prioritization of these 31 CSFs reveal that LCM projects involve more stakeholders than do general construction projects and require a correspondingly wider range of changes during each project. To identify more systematic and strategic approaches to stakeholder management in LCM projects, a framework was developed through factor analysis and focus-group interviews with project management experts. The framework is composed of the following five agendas: clear understanding of stakeholders, clear definition of the project, effective communication, responding to environmental changes, and social cooperation. The analysis results show that LCM projects require a stronger emphasis on responding to environmental changes and social cooperation. These results, along with the CSF priorities, reveal the necessity of taking customized approaches to LCM projects. The results of this analysis are expected to help LCM project managers effectively manage stakeholders.
    • Download: (284.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Stakeholder Management in Long-Term Complex Megaconstruction Projects: The Saemangeum Project

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4238254
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorHyoungbae Park
    contributor authorKyeongseok Kim
    contributor authorYong-Woo Kim
    contributor authorHyoungkwan Kim
    date accessioned2017-12-16T09:05:02Z
    date available2017-12-16T09:05:02Z
    date issued2017
    identifier other%28ASCE%29ME.1943-5479.0000515.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4238254
    description abstractThis paper identifies 31 critical success factors (CSFs) and suggests a framework for effective stakeholder management in long-term complex megaconstruction (LCM) projects that require more than 10 years for multipurpose development. The results of a survey on the prioritization of these 31 CSFs reveal that LCM projects involve more stakeholders than do general construction projects and require a correspondingly wider range of changes during each project. To identify more systematic and strategic approaches to stakeholder management in LCM projects, a framework was developed through factor analysis and focus-group interviews with project management experts. The framework is composed of the following five agendas: clear understanding of stakeholders, clear definition of the project, effective communication, responding to environmental changes, and social cooperation. The analysis results show that LCM projects require a stronger emphasis on responding to environmental changes and social cooperation. These results, along with the CSF priorities, reveal the necessity of taking customized approaches to LCM projects. The results of this analysis are expected to help LCM project managers effectively manage stakeholders.
    publisherAmerican Society of Civil Engineers
    titleStakeholder Management in Long-Term Complex Megaconstruction Projects: The Saemangeum Project
    typeJournal Paper
    journal volume33
    journal issue4
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000515
    treeJournal of Management in Engineering:;2017:;Volume ( 033 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian