YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Transportation Engineering, Part A: Systems
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Transportation Engineering, Part A: Systems
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Quantifying the Effectiveness of Methods Used to Improve Railway Track Performance over Soft Subgrades: Methodology and Case Study

    Source: Journal of Transportation Engineering, Part A: Systems:;2017:;Volume ( 143 ):;issue: 009
    Author:
    Alireza Roghani
    ,
    Renato Macciotta
    ,
    Michael T. Hendry
    DOI: 10.1061/JTEPBS.0000071
    Publisher: American Society of Civil Engineers
    Abstract: This paper presents a methodology for quantifying the effectiveness of different methods used to improve the railway track performance on soft subgrades. This methodology consists of quantifying the changes in track stiffness from vertical track deflection (VTD) measurements taken before and after the track was upgraded, and the evaluation of the roughness of the track that has developed since the track was upgraded. A case study is presented to explain the steps of this methodology. These upgrades consist of changing the rail from 49.6-kg/m (100-lb/yd) bolted rail to 57-kg/m (115-lb/yd) continuously welded rail (CWR), embankment reconstruction, and using a layer of geogrid at the subballast–subgrade interface. The results of the study show that the VTD measurements are capable of measuring changes in track deflection, and thus modulus, due to the upgrading of the track structures with a high enough resolution to distinguish between the differing test sections. The track geometry measurements suggest that not enough time or train traffic had passed to degrade the track geometry to a level that would start indicating issues in performance. The paper also evaluates the relative effectiveness of the different remediation methods at this study site. Replacement of jointed rail with heavier CWR significantly increased the track stiffness, more so than excavation of the subgrade and reconstruction of the embankment. The combined effect of CWR and the substructure upgrades further improved the track modulus. The geogrid can be used with CWR to reduce the amount of subballast required without an increase in track deflection.
    • Download: (1.720Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Quantifying the Effectiveness of Methods Used to Improve Railway Track Performance over Soft Subgrades: Methodology and Case Study

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4237707
    Collections
    • Journal of Transportation Engineering, Part A: Systems

    Show full item record

    contributor authorAlireza Roghani
    contributor authorRenato Macciotta
    contributor authorMichael T. Hendry
    date accessioned2017-12-16T09:02:11Z
    date available2017-12-16T09:02:11Z
    date issued2017
    identifier otherJTEPBS.0000071.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4237707
    description abstractThis paper presents a methodology for quantifying the effectiveness of different methods used to improve the railway track performance on soft subgrades. This methodology consists of quantifying the changes in track stiffness from vertical track deflection (VTD) measurements taken before and after the track was upgraded, and the evaluation of the roughness of the track that has developed since the track was upgraded. A case study is presented to explain the steps of this methodology. These upgrades consist of changing the rail from 49.6-kg/m (100-lb/yd) bolted rail to 57-kg/m (115-lb/yd) continuously welded rail (CWR), embankment reconstruction, and using a layer of geogrid at the subballast–subgrade interface. The results of the study show that the VTD measurements are capable of measuring changes in track deflection, and thus modulus, due to the upgrading of the track structures with a high enough resolution to distinguish between the differing test sections. The track geometry measurements suggest that not enough time or train traffic had passed to degrade the track geometry to a level that would start indicating issues in performance. The paper also evaluates the relative effectiveness of the different remediation methods at this study site. Replacement of jointed rail with heavier CWR significantly increased the track stiffness, more so than excavation of the subgrade and reconstruction of the embankment. The combined effect of CWR and the substructure upgrades further improved the track modulus. The geogrid can be used with CWR to reduce the amount of subballast required without an increase in track deflection.
    publisherAmerican Society of Civil Engineers
    titleQuantifying the Effectiveness of Methods Used to Improve Railway Track Performance over Soft Subgrades: Methodology and Case Study
    typeJournal Paper
    journal volume143
    journal issue9
    journal titleJournal of Transportation Engineering, Part A: Systems
    identifier doi10.1061/JTEPBS.0000071
    treeJournal of Transportation Engineering, Part A: Systems:;2017:;Volume ( 143 ):;issue: 009
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian