YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Direct and Indirect Costs of Change Orders

    Source: Practice Periodical on Structural Design and Construction:;2017:;Volume ( 022 ):;issue: 004
    Author:
    Daniel Duah
    ,
    M. G. Matt Syal
    DOI: 10.1061/(ASCE)SC.1943-5576.0000342
    Publisher: American Society of Civil Engineers
    Abstract: Pricing of construction change orders is one of the major causes of conflict among owners, designers, and contractors on a construction project. This article analyzes the inclusion and treatment of various direct-cost items in change orders prepared by trade contractors. It also discusses various markup percentages proposed and allowed for overhead and profit. It starts by compiling various direct-cost items and markup percentages from major standard contract documents. It then analyzes direct-cost items in terms of the categories of allowed, disallowed, and maybe/depends based on a weighting system; the markup percentages are also analyzed. The weighting system and the averaging are based on four standard contract documents; legal cases; federal regulations; surveys of 148 electrical contractors and 16 construction owners represented by the National Electrical Contractors Association (NECA), the ELECTRI Council, and the Construction Owners Association of America (COAA); six case studies provided by NECA members; industry standards; and other literature. Finally, the need to consider impact factors and corresponding consequential costs in the pricing of change orders is discussed. The work presented in this paper highlights the prevailing confusion and conflicts related to change-order pricing among owners, designers, general contractors, construction managers, and subcontractors. A major contribution of the research is the development of a standard process of costing change orders by providing change-order specifications for contractors within the project manual Division 1 specification.
    • Download: (115.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Direct and Indirect Costs of Change Orders

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4237328
    Collections
    • Journal of Structural Design and Construction Practice

    Show full item record

    contributor authorDaniel Duah
    contributor authorM. G. Matt Syal
    date accessioned2017-12-16T09:00:32Z
    date available2017-12-16T09:00:32Z
    date issued2017
    identifier other%28ASCE%29SC.1943-5576.0000342.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4237328
    description abstractPricing of construction change orders is one of the major causes of conflict among owners, designers, and contractors on a construction project. This article analyzes the inclusion and treatment of various direct-cost items in change orders prepared by trade contractors. It also discusses various markup percentages proposed and allowed for overhead and profit. It starts by compiling various direct-cost items and markup percentages from major standard contract documents. It then analyzes direct-cost items in terms of the categories of allowed, disallowed, and maybe/depends based on a weighting system; the markup percentages are also analyzed. The weighting system and the averaging are based on four standard contract documents; legal cases; federal regulations; surveys of 148 electrical contractors and 16 construction owners represented by the National Electrical Contractors Association (NECA), the ELECTRI Council, and the Construction Owners Association of America (COAA); six case studies provided by NECA members; industry standards; and other literature. Finally, the need to consider impact factors and corresponding consequential costs in the pricing of change orders is discussed. The work presented in this paper highlights the prevailing confusion and conflicts related to change-order pricing among owners, designers, general contractors, construction managers, and subcontractors. A major contribution of the research is the development of a standard process of costing change orders by providing change-order specifications for contractors within the project manual Division 1 specification.
    publisherAmerican Society of Civil Engineers
    titleDirect and Indirect Costs of Change Orders
    typeJournal Paper
    journal volume22
    journal issue4
    journal titlePractice Periodical on Structural Design and Construction
    identifier doi10.1061/(ASCE)SC.1943-5576.0000342
    treePractice Periodical on Structural Design and Construction:;2017:;Volume ( 022 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian