YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Risk Allocation and Risk Handling of Highway Projects in Taiwan

    Source: Journal of Management in Engineering:;2003:;Volume ( 019 ):;issue: 002
    Author:
    Ming-Teh Wang
    ,
    Hui-Yu Chou
    DOI: 10.1061/(ASCE)0742-597X(2003)19:2(60)
    Publisher: American Society of Civil Engineers
    Abstract: Risks always exist in construction projects and often cause schedule delay or cost overrun. Risk management is a key issue in project management. The first step of risk management is risk identification. It includes the recognition of potential risk event conditions in the project and the clarification of risk responsibilities. We conducted multiple-case studies using a systematic analytical procedure to identify risks in highway projects in Taiwan, to recognize risk allocation by contract clauses, and to analyze the influence of risk allocation on the contractor’s risk handling strategies. The results show that the owner allocates risks by stipulating specific contract clauses into five kinds of risk allocation conditions. If a risk is more controllable by the contractor, the owner has a greater tendency to allocate the risk to the contractor. Risk allocation determines which kinds of risks the contractor would take and influences the contractor’s risk handling decisions. The analysis furthermore indicates that, if the probability of a certain risk event condition is uncontrollable, then with the increasing possibility of taking the risk, the contractor’s tendency of risk handling changes from actively transferring the risk to passively retaining the risk. In contrast, if a risk is controllable and certainly allocated to the contractor, the contractor tends to take the initiative to reduce the impact caused by the risk event rather than retain the risk.
    • Download: (95.72Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Risk Allocation and Risk Handling of Highway Projects in Taiwan

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/42369
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorMing-Teh Wang
    contributor authorHui-Yu Chou
    date accessioned2017-05-08T21:11:48Z
    date available2017-05-08T21:11:48Z
    date copyrightApril 2003
    date issued2003
    identifier other%28asce%290742-597x%282003%2919%3A2%2860%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42369
    description abstractRisks always exist in construction projects and often cause schedule delay or cost overrun. Risk management is a key issue in project management. The first step of risk management is risk identification. It includes the recognition of potential risk event conditions in the project and the clarification of risk responsibilities. We conducted multiple-case studies using a systematic analytical procedure to identify risks in highway projects in Taiwan, to recognize risk allocation by contract clauses, and to analyze the influence of risk allocation on the contractor’s risk handling strategies. The results show that the owner allocates risks by stipulating specific contract clauses into five kinds of risk allocation conditions. If a risk is more controllable by the contractor, the owner has a greater tendency to allocate the risk to the contractor. Risk allocation determines which kinds of risks the contractor would take and influences the contractor’s risk handling decisions. The analysis furthermore indicates that, if the probability of a certain risk event condition is uncontrollable, then with the increasing possibility of taking the risk, the contractor’s tendency of risk handling changes from actively transferring the risk to passively retaining the risk. In contrast, if a risk is controllable and certainly allocated to the contractor, the contractor tends to take the initiative to reduce the impact caused by the risk event rather than retain the risk.
    publisherAmerican Society of Civil Engineers
    titleRisk Allocation and Risk Handling of Highway Projects in Taiwan
    typeJournal Paper
    journal volume19
    journal issue2
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)0742-597X(2003)19:2(60)
    treeJournal of Management in Engineering:;2003:;Volume ( 019 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian