contributor author | Benjamin P. Thompson | |
contributor author | Stuart D. Anderson | |
contributor author | Jeffrey S. Russell | |
contributor author | Awad S. Hanna | |
date accessioned | 2017-05-08T21:11:46Z | |
date available | 2017-05-08T21:11:46Z | |
date copyright | July 2002 | |
date issued | 2002 | |
identifier other | %28asce%290742-597x%282002%2918%3A3%28129%29.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/42349 | |
description abstract | This paper presents guidelines for implementing the construction warranty contracting method in the highway construction industry. A logical, step-by-step method for effectively applying the warranty contracting program for use in the highway construction industry is developed. Relevant issues that may present obstacles to the implementation are addressed, while the best practices, compiled from an evaluation of the current industry’s state-of-the-art practices, will assist an interested state highway agency in creating a warranty specification. In performing this research, the current use of warranty specifications among state highway agencies was examined, and an in-depth case study of the Wisconsin Department of Transportation’s warranty program was conducted. | |
publisher | American Society of Civil Engineers | |
title | Guidelines for Warranty Contracting for Highway Construction | |
type | Journal Paper | |
journal volume | 18 | |
journal issue | 3 | |
journal title | Journal of Management in Engineering | |
identifier doi | 10.1061/(ASCE)0742-597X(2002)18:3(129) | |
tree | Journal of Management in Engineering:;2002:;Volume ( 018 ):;issue: 003 | |
contenttype | Fulltext | |