YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Construction Coordination Activities: What Is Important and What Consumes Time

    Source: Journal of Management in Engineering:;2001:;Volume ( 017 ):;issue: 004
    Author:
    D. Darshi de Saram
    ,
    Syed M. Ahmed
    DOI: 10.1061/(ASCE)0742-597X(2001)17:4(202)
    Publisher: American Society of Civil Engineers
    Abstract: Coordination is an important function in the building process. Recent research has shown that poor or inadequate coordination is the best that is achieved on construction sites. Nevertheless, many authors of textbooks on construction project management have not discussed this vital topic. A literature review carried out in this present study revealed that there is a lack of formal understanding on how day-to-day coordination is actually achieved on a construction project. This research was directed at identifying what activities are performed to achieve coordination and, which among those are the most important and more time-consuming for a construction coordinator. In the absence of previous research, texts on the duties and responsibilities of project managers, clerks of works, construction engineers, etc., were reviewed from the contractor's project manager's perspective during the building phase of a construction project, and an array of issues relevant to achieving coordination were identified. Initially, the array included 64 coordination issues; a questionnaire was developed for construction project managers to indicate the relative importance and time consumed on a 3 point scale (i.e., high, mid or low). Thirty-three responses received from practitioners in the Hong Kong and Singapore construction industries indicate that identifying strategic activities and potential delays and ensuring the timeliness of all work are the most important activities. Conducting regular meetings and project reviews and analyzing the project performance, detecting variances and dealing with their effects (16th and 17th, respectively in order of importance) appear to be the most time-consuming activities.
    • Download: (85.03Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Construction Coordination Activities: What Is Important and What Consumes Time

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/42325
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorD. Darshi de Saram
    contributor authorSyed M. Ahmed
    date accessioned2017-05-08T21:11:44Z
    date available2017-05-08T21:11:44Z
    date copyrightOctober 2001
    date issued2001
    identifier other%28asce%290742-597x%282001%2917%3A4%28202%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42325
    description abstractCoordination is an important function in the building process. Recent research has shown that poor or inadequate coordination is the best that is achieved on construction sites. Nevertheless, many authors of textbooks on construction project management have not discussed this vital topic. A literature review carried out in this present study revealed that there is a lack of formal understanding on how day-to-day coordination is actually achieved on a construction project. This research was directed at identifying what activities are performed to achieve coordination and, which among those are the most important and more time-consuming for a construction coordinator. In the absence of previous research, texts on the duties and responsibilities of project managers, clerks of works, construction engineers, etc., were reviewed from the contractor's project manager's perspective during the building phase of a construction project, and an array of issues relevant to achieving coordination were identified. Initially, the array included 64 coordination issues; a questionnaire was developed for construction project managers to indicate the relative importance and time consumed on a 3 point scale (i.e., high, mid or low). Thirty-three responses received from practitioners in the Hong Kong and Singapore construction industries indicate that identifying strategic activities and potential delays and ensuring the timeliness of all work are the most important activities. Conducting regular meetings and project reviews and analyzing the project performance, detecting variances and dealing with their effects (16th and 17th, respectively in order of importance) appear to be the most time-consuming activities.
    publisherAmerican Society of Civil Engineers
    titleConstruction Coordination Activities: What Is Important and What Consumes Time
    typeJournal Paper
    journal volume17
    journal issue4
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)0742-597X(2001)17:4(202)
    treeJournal of Management in Engineering:;2001:;Volume ( 017 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian