YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • AMS
    • Monthly Weather Review
    • View Item
    •   YE&T Library
    • AMS
    • Monthly Weather Review
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Mesoscale Predictability of the “Surprise” Snowstorm of 24–25 January 2000

    Source: Monthly Weather Review:;2002:;volume( 130 ):;issue: 006::page 1617
    Author:
    Zhang, F.
    ,
    Snyder, Chris
    ,
    Rotunno, Richard
    DOI: 10.1175/1520-0493(2002)130<1617:MPOTSS>2.0.CO;2
    Publisher: American Meteorological Society
    Abstract: A mesoscale model is used here to investigate the possible sources of forecast error for the 24?25 January 2000 snowstorm along the east coast of the United States. The primary focus is the quantitative precipitation forecast out to lead times of 36 h. The success of the present high-resolution control forecast shows that the storm could have been well forecasted with conventional data in real time. Various experiments suggest that insufficient model grid resolution and errors in the initial conditions both contributed significantly to problems in the forecast. Other experiments, motivated by the possibility that the forecast errors arose from the operational analysis poorly fitting one or two key soundings, test the effects of withholding single soundings from the control initial conditions. While no single sounding results in forecast changes that are more than a small fraction of the error in the operational forecast, these experiments do reveal that the detailed mesoscale distribution of precipitation in the 24- or 36-h forecast can be significantly altered even by such small changes in the initial conditions. The experiments also reveal that the forecast changes arise from the rapid growth of error at scales below 500 km in association with moist processes. The results presented emphasize the difficulty of forecasting precipitation relative to, say, surface pressure and suggest that the predictability of mesoscale precipitation features in cases of the type studied here may be limited to less than 2?3 days.
    • Download: (4.332Mb)
    • Show Full MetaData Hide Full MetaData
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Mesoscale Predictability of the “Surprise” Snowstorm of 24–25 January 2000

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4205025
    Collections
    • Monthly Weather Review

    Show full item record

    contributor authorZhang, F.
    contributor authorSnyder, Chris
    contributor authorRotunno, Richard
    date accessioned2017-06-09T16:14:28Z
    date available2017-06-09T16:14:28Z
    date copyright2002/06/01
    date issued2002
    identifier issn0027-0644
    identifier otherams-63964.pdf
    identifier urihttp://onlinelibrary.yabesh.ir/handle/yetl/4205025
    description abstractA mesoscale model is used here to investigate the possible sources of forecast error for the 24?25 January 2000 snowstorm along the east coast of the United States. The primary focus is the quantitative precipitation forecast out to lead times of 36 h. The success of the present high-resolution control forecast shows that the storm could have been well forecasted with conventional data in real time. Various experiments suggest that insufficient model grid resolution and errors in the initial conditions both contributed significantly to problems in the forecast. Other experiments, motivated by the possibility that the forecast errors arose from the operational analysis poorly fitting one or two key soundings, test the effects of withholding single soundings from the control initial conditions. While no single sounding results in forecast changes that are more than a small fraction of the error in the operational forecast, these experiments do reveal that the detailed mesoscale distribution of precipitation in the 24- or 36-h forecast can be significantly altered even by such small changes in the initial conditions. The experiments also reveal that the forecast changes arise from the rapid growth of error at scales below 500 km in association with moist processes. The results presented emphasize the difficulty of forecasting precipitation relative to, say, surface pressure and suggest that the predictability of mesoscale precipitation features in cases of the type studied here may be limited to less than 2?3 days.
    publisherAmerican Meteorological Society
    titleMesoscale Predictability of the “Surprise” Snowstorm of 24–25 January 2000
    typeJournal Paper
    journal volume130
    journal issue6
    journal titleMonthly Weather Review
    identifier doi10.1175/1520-0493(2002)130<1617:MPOTSS>2.0.CO;2
    journal fristpage1617
    journal lastpage1632
    treeMonthly Weather Review:;2002:;volume( 130 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian