YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Environmental Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Environmental Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Predicting Release of PCBs at Point of Dredging

    Source: Journal of Environmental Engineering:;1993:;Volume ( 119 ):;issue: 001
    Author:
    Francis A. DiGiano
    ,
    Cass T. Miller
    ,
    Jeyong Yoon
    DOI: 10.1061/(ASCE)0733-9372(1993)119:1(72)
    Publisher: American Society of Civil Engineers
    Abstract: A simple laboratory test, referred to here as the dredging elutriate test (DRET), was sought to predict the concentration of contaminants in the water column at the point of dredging. The DRET is procedurally similar to the modified elutriate test developed by the U.S. Army Corps of Engineers to predict concentrations of contaminants at the point of disposal of dredge material. The objective of experimentation was to investigate the release of dissolved and suspended polychlorinated biphenyls (PCBs) as a function of initial concentration of sediment, aeration time, and settling time in the DRET. Settling time was found most important. Field data from a pilot dredging project in New Bedford Harbor, Mass. compared well to results of the DRET. Most of the PCB in the field and DRET were sorbed to small particles rather than dissolved. A good correlation was obtained between total PCB and total suspended solids. A sorption equilibrium model based on available partition coefficients described the sorbed‐dissolved PCB distribution. Particle size distribution analysis showed that the mean diameter was less than 10 μm after just 0.5 h of settling and decreased very little with further settling. These particles and their PCB burden have the potential to be transported away from a dredging site.
    • Download: (1.086Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Predicting Release of PCBs at Point of Dredging

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/40864
    Collections
    • Journal of Environmental Engineering

    Show full item record

    contributor authorFrancis A. DiGiano
    contributor authorCass T. Miller
    contributor authorJeyong Yoon
    date accessioned2017-05-08T21:09:30Z
    date available2017-05-08T21:09:30Z
    date copyrightJanuary 1993
    date issued1993
    identifier other%28asce%290733-9372%281993%29119%3A1%2872%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/40864
    description abstractA simple laboratory test, referred to here as the dredging elutriate test (DRET), was sought to predict the concentration of contaminants in the water column at the point of dredging. The DRET is procedurally similar to the modified elutriate test developed by the U.S. Army Corps of Engineers to predict concentrations of contaminants at the point of disposal of dredge material. The objective of experimentation was to investigate the release of dissolved and suspended polychlorinated biphenyls (PCBs) as a function of initial concentration of sediment, aeration time, and settling time in the DRET. Settling time was found most important. Field data from a pilot dredging project in New Bedford Harbor, Mass. compared well to results of the DRET. Most of the PCB in the field and DRET were sorbed to small particles rather than dissolved. A good correlation was obtained between total PCB and total suspended solids. A sorption equilibrium model based on available partition coefficients described the sorbed‐dissolved PCB distribution. Particle size distribution analysis showed that the mean diameter was less than 10 μm after just 0.5 h of settling and decreased very little with further settling. These particles and their PCB burden have the potential to be transported away from a dredging site.
    publisherAmerican Society of Civil Engineers
    titlePredicting Release of PCBs at Point of Dredging
    typeJournal Paper
    journal volume119
    journal issue1
    journal titleJournal of Environmental Engineering
    identifier doi10.1061/(ASCE)0733-9372(1993)119:1(72)
    treeJournal of Environmental Engineering:;1993:;Volume ( 119 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian