YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Trade-off between Total Cost and Reliability for Anytown Water Distribution Network

    Source: Journal of Water Resources Planning and Management:;2005:;Volume ( 131 ):;issue: 003
    Author:
    Raziyeh Farmani
    ,
    Godfrey A. Walters
    ,
    Dragan A. Savic
    DOI: 10.1061/(ASCE)0733-9496(2005)131:3(161)
    Publisher: American Society of Civil Engineers
    Abstract: This paper investigates the application of multiobjective evolutionary algorithms to the identification of the payoff characteristic between total cost and reliability of a water distribution system using the well-known “Anytown” network as an example. An expanded rehabilitation problem is considered where the design variables are the pipe rehabilitation decisions, tank sizing, tank siting, and pump operation schedules. To provide flexibility, the network is designed and operated under multiple loading conditions. Inclusion of pump operation schedules requires consideration of water system operation over an extended period. The cost of the solution includes the capital costs of pipes and tanks as well as the present value of the energy consumed during a specified period. Optimization tends to reduce costs by reducing the diameter of, or completely eliminating, some pipes, thus leaving the system with insufficient capacity to respond to pipe breaks or demands that exceed design values without violating required performance levels. A resilience index is considered as a second objective to increase the hydraulic reliability and availability of water during pipe failures. Sensitivity analysis of solutions on the payoff curve generated by twin-objective optimization shows poor performance of these networks under random pipe failure or a pump being out of service. The minimum surplus head is added as a third objective to overcome the shortcomings of the resilience index. Results are presented for the payoff characteristics between total cost and reliability for
    • Download: (188.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Trade-off between Total Cost and Reliability for Anytown Water Distribution Network

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/39944
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorRaziyeh Farmani
    contributor authorGodfrey A. Walters
    contributor authorDragan A. Savic
    date accessioned2017-05-08T21:08:00Z
    date available2017-05-08T21:08:00Z
    date copyrightMay 2005
    date issued2005
    identifier other%28asce%290733-9496%282005%29131%3A3%28161%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/39944
    description abstractThis paper investigates the application of multiobjective evolutionary algorithms to the identification of the payoff characteristic between total cost and reliability of a water distribution system using the well-known “Anytown” network as an example. An expanded rehabilitation problem is considered where the design variables are the pipe rehabilitation decisions, tank sizing, tank siting, and pump operation schedules. To provide flexibility, the network is designed and operated under multiple loading conditions. Inclusion of pump operation schedules requires consideration of water system operation over an extended period. The cost of the solution includes the capital costs of pipes and tanks as well as the present value of the energy consumed during a specified period. Optimization tends to reduce costs by reducing the diameter of, or completely eliminating, some pipes, thus leaving the system with insufficient capacity to respond to pipe breaks or demands that exceed design values without violating required performance levels. A resilience index is considered as a second objective to increase the hydraulic reliability and availability of water during pipe failures. Sensitivity analysis of solutions on the payoff curve generated by twin-objective optimization shows poor performance of these networks under random pipe failure or a pump being out of service. The minimum surplus head is added as a third objective to overcome the shortcomings of the resilience index. Results are presented for the payoff characteristics between total cost and reliability for
    publisherAmerican Society of Civil Engineers
    titleTrade-off between Total Cost and Reliability for Anytown Water Distribution Network
    typeJournal Paper
    journal volume131
    journal issue3
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)0733-9496(2005)131:3(161)
    treeJournal of Water Resources Planning and Management:;2005:;Volume ( 131 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian