YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Striking the Balance: Long-Term Groundwater Monitoring Design for Conflicting Objectives

    Source: Journal of Water Resources Planning and Management:;2004:;Volume ( 130 ):;issue: 002
    Author:
    Patrick M. Reed
    ,
    Barbara S. Minsker
    DOI: 10.1061/(ASCE)0733-9496(2004)130:2(140)
    Publisher: American Society of Civil Engineers
    Abstract: This study demonstrates the use of high-order Pareto optimization (i.e., optimizing a system for more than two objectives) on a long-term monitoring (LTM) application. The LTM application combines quantile kriging and the nondominated sorted genetic algorithm-II
    • Download: (226.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Striking the Balance: Long-Term Groundwater Monitoring Design for Conflicting Objectives

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/39878
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorPatrick M. Reed
    contributor authorBarbara S. Minsker
    date accessioned2017-05-08T21:07:55Z
    date available2017-05-08T21:07:55Z
    date copyrightMarch 2004
    date issued2004
    identifier other%28asce%290733-9496%282004%29130%3A2%28140%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/39878
    description abstractThis study demonstrates the use of high-order Pareto optimization (i.e., optimizing a system for more than two objectives) on a long-term monitoring (LTM) application. The LTM application combines quantile kriging and the nondominated sorted genetic algorithm-II
    publisherAmerican Society of Civil Engineers
    titleStriking the Balance: Long-Term Groundwater Monitoring Design for Conflicting Objectives
    typeJournal Paper
    journal volume130
    journal issue2
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)0733-9496(2004)130:2(140)
    treeJournal of Water Resources Planning and Management:;2004:;Volume ( 130 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian