YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Cost-Benefit Analysis Based on Referendum CV: Dealing with Uncertainty

    Source: Journal of Water Resources Planning and Management:;2000:;Volume ( 126 ):;issue: 006
    Author:
    William J. Vaughan
    ,
    Clifford S. Russell
    ,
    Diego J. Rodriguez
    ,
    Arthur H. Darling
    DOI: 10.1061/(ASCE)0733-9496(2000)126:6(351)
    Publisher: American Society of Civil Engineers
    Abstract: An interesting and potentially important, but little appreciated, result of the use of dichotomous-choice contingent valuation (CV) techniques is that there are about a dozen ways to deal econometrically with the data on bid acceptance to construct a mean or median estimate of willingness-to-pay benefits, none of which is clearly the correct choice. They produce measures of central tendency that can differ, from lowest to highest, by factors ranging from 5 to 15. This is a source of uncertainty in benefit or damage estimation that can easily dominate the more traditionally recognized statistical uncertainty based on noise in the response (and respondent) data. It potentially can introduce ambiguity into a cost-benefit test of economic feasibility if a prospective investment either passes the test based on some willingness-to-pay measures or fails it based on others. These points are illustrated using actual data from a well-designed dichotomous-choice CV survey administered to residents of São Paulo, Brazil, as part of the application process for a loan to cover a multiphase project to improve the quality of the Tietê River.
    • Download: (92.27Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Cost-Benefit Analysis Based on Referendum CV: Dealing with Uncertainty

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/39665
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorWilliam J. Vaughan
    contributor authorClifford S. Russell
    contributor authorDiego J. Rodriguez
    contributor authorArthur H. Darling
    date accessioned2017-05-08T21:07:36Z
    date available2017-05-08T21:07:36Z
    date copyrightDecember 2000
    date issued2000
    identifier other%28asce%290733-9496%282000%29126%3A6%28351%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/39665
    description abstractAn interesting and potentially important, but little appreciated, result of the use of dichotomous-choice contingent valuation (CV) techniques is that there are about a dozen ways to deal econometrically with the data on bid acceptance to construct a mean or median estimate of willingness-to-pay benefits, none of which is clearly the correct choice. They produce measures of central tendency that can differ, from lowest to highest, by factors ranging from 5 to 15. This is a source of uncertainty in benefit or damage estimation that can easily dominate the more traditionally recognized statistical uncertainty based on noise in the response (and respondent) data. It potentially can introduce ambiguity into a cost-benefit test of economic feasibility if a prospective investment either passes the test based on some willingness-to-pay measures or fails it based on others. These points are illustrated using actual data from a well-designed dichotomous-choice CV survey administered to residents of São Paulo, Brazil, as part of the application process for a loan to cover a multiphase project to improve the quality of the Tietê River.
    publisherAmerican Society of Civil Engineers
    titleCost-Benefit Analysis Based on Referendum CV: Dealing with Uncertainty
    typeJournal Paper
    journal volume126
    journal issue6
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)0733-9496(2000)126:6(351)
    treeJournal of Water Resources Planning and Management:;2000:;Volume ( 126 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian