YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Derived Power Production and Energy Drawdown Rules for Reservoirs

    Source: Journal of Water Resources Planning and Management:;2000:;Volume ( 126 ):;issue: 002
    Author:
    Jay R. Lund
    DOI: 10.1061/(ASCE)0733-9496(2000)126:2(108)
    Publisher: American Society of Civil Engineers
    Abstract: Theoretical hydropower operation rules are derived and discussed for reservoirs in parallel, in series, and single reservoirs for cases where reservoirs typically refill before they empty and for parallel reservoirs when reservoirs are expected to draw down to empty. These hydropower rules offer a simplified economic basis for allocating storage and energy in multireservoir hydropower systems. The approach is demonstrated for an illustrative example and should be helpful for making decisions regarding hydropower releases over time, subject to the limited conditions under which these rules hold.
    • Download: (54.50Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Derived Power Production and Energy Drawdown Rules for Reservoirs

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/39625
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorJay R. Lund
    date accessioned2017-05-08T21:07:34Z
    date available2017-05-08T21:07:34Z
    date copyrightMarch 2000
    date issued2000
    identifier other%28asce%290733-9496%282000%29126%3A2%28108%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/39625
    description abstractTheoretical hydropower operation rules are derived and discussed for reservoirs in parallel, in series, and single reservoirs for cases where reservoirs typically refill before they empty and for parallel reservoirs when reservoirs are expected to draw down to empty. These hydropower rules offer a simplified economic basis for allocating storage and energy in multireservoir hydropower systems. The approach is demonstrated for an illustrative example and should be helpful for making decisions regarding hydropower releases over time, subject to the limited conditions under which these rules hold.
    publisherAmerican Society of Civil Engineers
    titleDerived Power Production and Energy Drawdown Rules for Reservoirs
    typeJournal Paper
    journal volume126
    journal issue2
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)0733-9496(2000)126:2(108)
    treeJournal of Water Resources Planning and Management:;2000:;Volume ( 126 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian