| contributor author | Ahmed Al-Futaisi | |
| contributor author | Jery R. Stedinger | |
| date accessioned | 2017-05-08T21:07:32Z | |
| date available | 2017-05-08T21:07:32Z | |
| date copyright | November 1999 | |
| date issued | 1999 | |
| identifier other | %28asce%290733-9496%281999%29125%3A6%28314%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/39603 | |
| description abstract | Hydrologic, hydraulic, and economic uncertainties impact the economic attractiveness of flood-risk management projects. In particular, uncertainty in the calculation of expected annual damages introduces uncertainty into economic evaluations. This study develops a hypothetical basin to explore the performance of designs identified by different economic-risk decision models. A new decision model includes an explicit quantification of uncertainty in the marginal net benefits and hence in the reliability of net benefits generated by the last increment of a project. Monte Carlo analyses show that the uncertainty in total project benefits may not reveal large uncertainties associated with the last increments of a project. In terms of economic performance of the different descriptions of hydrologic risk, expected probability and traditional maximum likelihood flood-risk estimators are roughly equivalent. The new decision model identified less costly projects that achieved nearly the same average net benefits and had a greater probability of recovering the last dollar spent. | |
| publisher | American Society of Civil Engineers | |
| title | Hydrologic and Economic Uncertainties and Flood-Risk Project Design | |
| type | Journal Paper | |
| journal volume | 125 | |
| journal issue | 6 | |
| journal title | Journal of Water Resources Planning and Management | |
| identifier doi | 10.1061/(ASCE)0733-9496(1999)125:6(314) | |
| tree | Journal of Water Resources Planning and Management:;1999:;Volume ( 125 ):;issue: 006 | |
| contenttype | Fulltext | |