YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Comparison and Assessment of Zero-Rise Floodplain Ordinances

    Source: Journal of Water Resources Planning and Management:;1997:;Volume ( 123 ):;issue: 004
    Author:
    Andrew Wood
    ,
    Richard Palmer
    ,
    Catherine Petroff
    DOI: 10.1061/(ASCE)0733-9496(1997)123:4(239)
    Publisher: American Society of Civil Engineers
    Abstract: This paper compares and evaluates the implications of some zero-risk regulations, particularly zero-rise floodplain ordinances. An ordinance for King County, Wash., is used to illustrate the challenges of implementing such restrictions and their resulting implications for bridge design. The evaluation is performed by comparing the King County floodplain regulation to similarly restrictive regulations in other states and counties and to other zero tolerance regulations. The bridge design and construction costs associated with the ordinance since 1990 are also reviewed, as are procedures for obtaining variances from the zero-rise criterion. It was found that in King County the zero-rise criterion compounds the already existing complexities of bridge design requirements. Important differences between the King County regulations and zero-rise requirements in other locales were found to include: freedom from substantial clearance requirements, pier-in-channel prohibitions (unrelated to backwater considerations), exemptions for replacement in-kind, lenient permitting processes for rises where no damage is anticipated, and the ability of approach roads to cause flood. The zero-rise ordinance was found to increase bridge design and construction costs by about 40% on the bridges for which backwater was a constraint. Variance procedures were as impractical in other locales as in King County, but mitigation options, such as the purchase of flooding easements, were more frequently pursued.
    • Download: (1023.Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Comparison and Assessment of Zero-Rise Floodplain Ordinances

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/39489
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorAndrew Wood
    contributor authorRichard Palmer
    contributor authorCatherine Petroff
    date accessioned2017-05-08T21:07:21Z
    date available2017-05-08T21:07:21Z
    date copyrightJuly 1997
    date issued1997
    identifier other%28asce%290733-9496%281997%29123%3A4%28239%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/39489
    description abstractThis paper compares and evaluates the implications of some zero-risk regulations, particularly zero-rise floodplain ordinances. An ordinance for King County, Wash., is used to illustrate the challenges of implementing such restrictions and their resulting implications for bridge design. The evaluation is performed by comparing the King County floodplain regulation to similarly restrictive regulations in other states and counties and to other zero tolerance regulations. The bridge design and construction costs associated with the ordinance since 1990 are also reviewed, as are procedures for obtaining variances from the zero-rise criterion. It was found that in King County the zero-rise criterion compounds the already existing complexities of bridge design requirements. Important differences between the King County regulations and zero-rise requirements in other locales were found to include: freedom from substantial clearance requirements, pier-in-channel prohibitions (unrelated to backwater considerations), exemptions for replacement in-kind, lenient permitting processes for rises where no damage is anticipated, and the ability of approach roads to cause flood. The zero-rise ordinance was found to increase bridge design and construction costs by about 40% on the bridges for which backwater was a constraint. Variance procedures were as impractical in other locales as in King County, but mitigation options, such as the purchase of flooding easements, were more frequently pursued.
    publisherAmerican Society of Civil Engineers
    titleComparison and Assessment of Zero-Rise Floodplain Ordinances
    typeJournal Paper
    journal volume123
    journal issue4
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)0733-9496(1997)123:4(239)
    treeJournal of Water Resources Planning and Management:;1997:;Volume ( 123 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian