Show simple item record

contributor authorGina K. Beim
contributor authorBenjamin F. Hobbs
date accessioned2017-05-08T21:07:20Z
date available2017-05-08T21:07:20Z
date copyrightMay 1997
date issued1997
identifier other%28asce%290733-9496%281997%29123%3A3%28169%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/39480
description abstractThe use of event trees and subjective probabilities in risk analysis is illustrated via a case study: the estimation of the probability of closure of Poe Lock on St. Marys River (Sault Ste. Marie, Mich.) because of vessel accidents and other nonstructural failures. The risk of closure is needed to determine the benefits of building a second Poe-class lock at that location. An event tree structures the risk analysis. Probabilities associated with the branches of the tree were developed from a combination of historical data and subjective probabilities. The latter were obtained in workshops with navigation experts. This paper summarizes the risk analysis, and discusses the difficulties associated with obtaining the necessary probabilities. It was found that a 30-day closure could occur about once every 50 years. The results are most sensitive to assumptions concerning how often ships hit lock gates.
publisherAmerican Society of Civil Engineers
titleEvent Tree Analysis of Lock Closure Risks
typeJournal Paper
journal volume123
journal issue3
journal titleJournal of Water Resources Planning and Management
identifier doi10.1061/(ASCE)0733-9496(1997)123:3(169)
treeJournal of Water Resources Planning and Management:;1997:;Volume ( 123 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record