YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Planning Reservoir Operations with Imprecise Objectives

    Source: Journal of Water Resources Planning and Management:;1997:;Volume ( 123 ):;issue: 003
    Author:
    Darrell G. Fontane
    ,
    Timothy K. Gates
    ,
    Enrique Moncada
    DOI: 10.1061/(ASCE)0733-9496(1997)123:3(154)
    Publisher: American Society of Civil Engineers
    Abstract: Imprecise and noncommensurable objectives for reservoir operation are addressed through fuzzy dynamic programming using an implicit stochastic approach. Fuzzy membership functions for evaluating the achievement of a linguistically described operational goal and linguistically described constraints are estimated from surveys of decision makers. Summary statistics of the membership function values for optimal operation provide easily interpreted measures of degree of satisfaction among diverse objectives. An example application to the proposed Grey Mountain Reservoir on the Cache la Poudre River in northern Colorado showed that the expected degree of satisfaction for water supply objectives (constraints) would exceed 70% in six of 12 months, while 90% satisfaction of the flood control objective could be expected throughout the year. Expected degrees of satisfaction for storage, recreational, fish habitat, and hydropower objectives are substantially lower. Relative variability in predicted degrees of satisfaction is high. The average composite degree of satisfaction for the project is moderate, has a general seasonal trend, and is substantially variable in late summer and early fall.
    • Download: (1.238Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Planning Reservoir Operations with Imprecise Objectives

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/39478
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorDarrell G. Fontane
    contributor authorTimothy K. Gates
    contributor authorEnrique Moncada
    date accessioned2017-05-08T21:07:20Z
    date available2017-05-08T21:07:20Z
    date copyrightMay 1997
    date issued1997
    identifier other%28asce%290733-9496%281997%29123%3A3%28154%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/39478
    description abstractImprecise and noncommensurable objectives for reservoir operation are addressed through fuzzy dynamic programming using an implicit stochastic approach. Fuzzy membership functions for evaluating the achievement of a linguistically described operational goal and linguistically described constraints are estimated from surveys of decision makers. Summary statistics of the membership function values for optimal operation provide easily interpreted measures of degree of satisfaction among diverse objectives. An example application to the proposed Grey Mountain Reservoir on the Cache la Poudre River in northern Colorado showed that the expected degree of satisfaction for water supply objectives (constraints) would exceed 70% in six of 12 months, while 90% satisfaction of the flood control objective could be expected throughout the year. Expected degrees of satisfaction for storage, recreational, fish habitat, and hydropower objectives are substantially lower. Relative variability in predicted degrees of satisfaction is high. The average composite degree of satisfaction for the project is moderate, has a general seasonal trend, and is substantially variable in late summer and early fall.
    publisherAmerican Society of Civil Engineers
    titlePlanning Reservoir Operations with Imprecise Objectives
    typeJournal Paper
    journal volume123
    journal issue3
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)0733-9496(1997)123:3(154)
    treeJournal of Water Resources Planning and Management:;1997:;Volume ( 123 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian