YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Analyzing Water Main Replacement Policies

    Source: Journal of Water Resources Planning and Management:;1990:;Volume ( 116 ):;issue: 003
    Author:
    James W. Male
    ,
    Thomas M. Walski
    ,
    Adam H. Slutsky
    DOI: 10.1061/(ASCE)0733-9496(1990)116:3(362)
    Publisher: American Society of Civil Engineers
    Abstract: This paper presents the results of the application of a procedure to assist in planning for the rehabilitation of a water distribution system. The procedure is applied to New York City and incorporates the costs of replacing water mains and those of repairing main breaks to determine least‐cost planning strategies. Results show that New York's current policy of replacing main segments that have had two or more breaks is the least‐cost approach on a city‐wide basis. However, application of slightly different strategies to different pipe diameters and to different boroughs can yield slightly lower costs. Results of the procedure are sensitive to the discount rate and the costs associated with main breaks. Results show that delaying replacement of mains beyond an optimal time yields higher total costs. Several of the results can be generalized and are applicable to distribution • systems of other utilities: (1) Smaller diameter mains should be replaced more frequently, given all other factors are the same; (2) reasonable, least‐cost strategies can be approached even with uncertain input parameter values; (3) knowledge of costs associated with breaks is very important; and (4) in addition to cost, the resulting physical integrity of the system is very important.
    • Download: (895.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Analyzing Water Main Replacement Policies

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/39031
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorJames W. Male
    contributor authorThomas M. Walski
    contributor authorAdam H. Slutsky
    date accessioned2017-05-08T21:06:38Z
    date available2017-05-08T21:06:38Z
    date copyrightMay 1990
    date issued1990
    identifier other%28asce%290733-9496%281990%29116%3A3%28362%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/39031
    description abstractThis paper presents the results of the application of a procedure to assist in planning for the rehabilitation of a water distribution system. The procedure is applied to New York City and incorporates the costs of replacing water mains and those of repairing main breaks to determine least‐cost planning strategies. Results show that New York's current policy of replacing main segments that have had two or more breaks is the least‐cost approach on a city‐wide basis. However, application of slightly different strategies to different pipe diameters and to different boroughs can yield slightly lower costs. Results of the procedure are sensitive to the discount rate and the costs associated with main breaks. Results show that delaying replacement of mains beyond an optimal time yields higher total costs. Several of the results can be generalized and are applicable to distribution • systems of other utilities: (1) Smaller diameter mains should be replaced more frequently, given all other factors are the same; (2) reasonable, least‐cost strategies can be approached even with uncertain input parameter values; (3) knowledge of costs associated with breaks is very important; and (4) in addition to cost, the resulting physical integrity of the system is very important.
    publisherAmerican Society of Civil Engineers
    titleAnalyzing Water Main Replacement Policies
    typeJournal Paper
    journal volume116
    journal issue3
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)0733-9496(1990)116:3(362)
    treeJournal of Water Resources Planning and Management:;1990:;Volume ( 116 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian