| contributor author | J. Alberto Tejada‐Guibert | |
| contributor author | Jery R. Stedinger | |
| contributor author | Konstantin Staschus | |
| date accessioned | 2017-05-08T21:06:36Z | |
| date available | 2017-05-08T21:06:36Z | |
| date copyright | January 1990 | |
| date issued | 1990 | |
| identifier other | %28asce%290733-9496%281990%29116%3A1%2852%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/39012 | |
| description abstract | CVPOP is a nonlinear programming model for the optimization of the multi‐month operation of the hydropower system of the California Central Valley Project (CVP). CVPOP includes the dependence of energy values within each month on the capacity factor of the generating unit, avoiding the simplification of assuming constant monthly or yearly values as is common in other models. The model also includes contractual energy and capacity constraints which are nonlinear because of the powerplants' variable head performance curves (capability in MW and energy production rate in kWh per unit release versus reservoir storage). An example illustrates the difference between the values of the energy generated with operations schedules obtained using different objective functions. | |
| publisher | American Society of Civil Engineers | |
| title | Optimization of Value of CVP's Hydropower Production | |
| type | Journal Paper | |
| journal volume | 116 | |
| journal issue | 1 | |
| journal title | Journal of Water Resources Planning and Management | |
| identifier doi | 10.1061/(ASCE)0733-9496(1990)116:1(52) | |
| tree | Journal of Water Resources Planning and Management:;1990:;Volume ( 116 ):;issue: 001 | |
| contenttype | Fulltext | |