YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Central Arizona Project Supervisory Control System

    Source: Journal of Water Resources Planning and Management:;1986:;Volume ( 112 ):;issue: 003
    Author:
    Robert S. Gooch
    ,
    Albert L. Graves
    DOI: 10.1061/(ASCE)0733-9496(1986)112:3(382)
    Publisher: American Society of Civil Engineers
    Abstract: The Central Arizona Project (CAP), one of the nation's largest water conveyance systems, is designed to deliver much of Arizona's allotment of Colorado River water for municipal, industrial, and agricultural uses in central and southern Arizona. The size and nature of the CAP dictates the use of a computer‐based programmable master supervisory control (PMSC) system as the primary means of operating the aqueduct. A dual‐computer master station is connected to remote terminal units (RTUs) located at each pumping plant, checkgate, and turnout. Through the RTUs, the master station can send instructions to, and receive information from, any point along the • aqueduct. Complex scheduling models generate pump, checkgate, and turnout schedules for the entire aqueduct system. These scheduling models are based on a constant volume philosophy of operation to keep the system responsive to changes in demands. Optimization models can modify these schedules to take advantage of the less expensive off‐peak power costs. The PMSC will also monitor the aqueduct depths and flows measured in the field and compare them to those predicted in the scheduling models. If a large enough divergence occurs, the dispatcher is alerted and predetermined reaction procedures are implemented to shut down or stabilize the aqueduct.
    • Download: (802.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Central Arizona Project Supervisory Control System

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/38789
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorRobert S. Gooch
    contributor authorAlbert L. Graves
    date accessioned2017-05-08T21:06:15Z
    date available2017-05-08T21:06:15Z
    date copyrightJuly 1986
    date issued1986
    identifier other%28asce%290733-9496%281986%29112%3A3%28382%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/38789
    description abstractThe Central Arizona Project (CAP), one of the nation's largest water conveyance systems, is designed to deliver much of Arizona's allotment of Colorado River water for municipal, industrial, and agricultural uses in central and southern Arizona. The size and nature of the CAP dictates the use of a computer‐based programmable master supervisory control (PMSC) system as the primary means of operating the aqueduct. A dual‐computer master station is connected to remote terminal units (RTUs) located at each pumping plant, checkgate, and turnout. Through the RTUs, the master station can send instructions to, and receive information from, any point along the • aqueduct. Complex scheduling models generate pump, checkgate, and turnout schedules for the entire aqueduct system. These scheduling models are based on a constant volume philosophy of operation to keep the system responsive to changes in demands. Optimization models can modify these schedules to take advantage of the less expensive off‐peak power costs. The PMSC will also monitor the aqueduct depths and flows measured in the field and compare them to those predicted in the scheduling models. If a large enough divergence occurs, the dispatcher is alerted and predetermined reaction procedures are implemented to shut down or stabilize the aqueduct.
    publisherAmerican Society of Civil Engineers
    titleCentral Arizona Project Supervisory Control System
    typeJournal Paper
    journal volume112
    journal issue3
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)0733-9496(1986)112:3(382)
    treeJournal of Water Resources Planning and Management:;1986:;Volume ( 112 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian