YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Output Increase From Existing Hydroelectric Plants

    Source: Journal of Water Resources Planning and Management:;1984:;Volume ( 110 ):;issue: 004
    Author:
    Darryl W. Davis
    ,
    John J. Buckley
    DOI: 10.1061/(ASCE)0733-9496(1984)110:4(361)
    Publisher: American Society of Civil Engineers
    Abstract: The potential for increasing the energy output of existing hydroelectric plants was investigated on a national scale. Analysis was performed on 1,288 sites (the complete inventory) for increases through enlarging powerhouses, modifying or replacing turbines and generators, and improving water handling works. The potential energy increase was found to be about 11% requiring an increase of 22% in installed capacity. Virtually all the increase was found to be from enlargement of existing powerhouses (adding additional units).
    • Download: (754.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Output Increase From Existing Hydroelectric Plants

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/38701
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorDarryl W. Davis
    contributor authorJohn J. Buckley
    date accessioned2017-05-08T21:06:05Z
    date available2017-05-08T21:06:05Z
    date copyrightOctober 1984
    date issued1984
    identifier other%28asce%290733-9496%281984%29110%3A4%28361%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/38701
    description abstractThe potential for increasing the energy output of existing hydroelectric plants was investigated on a national scale. Analysis was performed on 1,288 sites (the complete inventory) for increases through enlarging powerhouses, modifying or replacing turbines and generators, and improving water handling works. The potential energy increase was found to be about 11% requiring an increase of 22% in installed capacity. Virtually all the increase was found to be from enlargement of existing powerhouses (adding additional units).
    publisherAmerican Society of Civil Engineers
    titleOutput Increase From Existing Hydroelectric Plants
    typeJournal Paper
    journal volume110
    journal issue4
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)0733-9496(1984)110:4(361)
    treeJournal of Water Resources Planning and Management:;1984:;Volume ( 110 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian