YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Reservoir Operation by Linear and Dynamic Programming

    Source: Journal of Water Resources Planning and Management:;1983:;Volume ( 109 ):;issue: 004
    Author:
    Miguel A. Mariño
    ,
    Behzad Mohammadi
    DOI: 10.1061/(ASCE)0733-9496(1983)109:4(303)
    Publisher: American Society of Civil Engineers
    Abstract: The operation of reservoirs often requires frequent updating of the results of the operation model. This is mainly because of errors involved in forecasting the natural inflows to the reservoirs or demands for water and energy or both. Current models used for operation usually require the use of large computers because of their core‐storage and computation‐time requirements. Frequent use of such models for the purpose of updating will often result in high computation cost and usually involves long turnaround times. This paper presents an efficient algorithm for the monthly operation of a system of two parallel multipurpose reservoirs that is solved with a minicomputer. The operation model is applied to Shasta and Folsom reservoirs of the California Central Valley Project, and the results are reviewed.
    • Download: (1.001Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Reservoir Operation by Linear and Dynamic Programming

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/38660
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorMiguel A. Mariño
    contributor authorBehzad Mohammadi
    date accessioned2017-05-08T21:06:01Z
    date available2017-05-08T21:06:01Z
    date copyrightOctober 1983
    date issued1983
    identifier other%28asce%290733-9496%281983%29109%3A4%28303%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/38660
    description abstractThe operation of reservoirs often requires frequent updating of the results of the operation model. This is mainly because of errors involved in forecasting the natural inflows to the reservoirs or demands for water and energy or both. Current models used for operation usually require the use of large computers because of their core‐storage and computation‐time requirements. Frequent use of such models for the purpose of updating will often result in high computation cost and usually involves long turnaround times. This paper presents an efficient algorithm for the monthly operation of a system of two parallel multipurpose reservoirs that is solved with a minicomputer. The operation model is applied to Shasta and Folsom reservoirs of the California Central Valley Project, and the results are reviewed.
    publisherAmerican Society of Civil Engineers
    titleReservoir Operation by Linear and Dynamic Programming
    typeJournal Paper
    journal volume109
    journal issue4
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)0733-9496(1983)109:4(303)
    treeJournal of Water Resources Planning and Management:;1983:;Volume ( 109 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian