Show simple item record

contributor authorSangsoo Lee
contributor authorCarroll J. Messer
contributor authorKeechoo Choi
date accessioned2017-05-08T21:04:43Z
date available2017-05-08T21:04:43Z
date copyrightOctober 2006
date issued2006
identifier other%28asce%290733-947x%282006%29132%3A10%28790%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/37817
description abstractActuated signal operations for congested conditions were evaluated with a simulation study at diamond interchanges. Both three-phase and four-phase with two-overlap phasing strategies were employed, with four ramp spacings and traffic patterns. The performance difference was discussed with throughput, average delay, and total stops. Results showed that four-phase control gave less or comparable average delay (or more throughput) for most traffic patterns at ramp spacings of
publisherAmerican Society of Civil Engineers
titleActuated Signal Operations of Congested Diamond Interchanges
typeJournal Paper
journal volume132
journal issue10
journal titleJournal of Transportation Engineering, Part A: Systems
identifier doi10.1061/(ASCE)0733-947X(2006)132:10(790)
treeJournal of Transportation Engineering, Part A: Systems:;2006:;Volume ( 132 ):;issue: 010
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record