YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Concurrent Delays in Construction Projects

    Source: Journal of Construction Engineering and Management:;1987:;Volume ( 113 ):;issue: 004
    Author:
    Zaki M. Kraiem
    ,
    James E. Diekmann
    DOI: 10.1061/(ASCE)0733-9364(1987)113:4(591)
    Publisher: American Society of Civil Engineers
    Abstract: The time allowed for construction project performance is usually an important consideration for both the project owner and the project contractor. Yet, it is typical for construction projects to be delayed. Delays may be caused by the owner (compensable delay), by the contractor (nonexcusable delay), by acts of god, or a third party (excusable delay), or several different kinds of delays may happen concurrently. Because of the many sources and causes of construction delays, it is often difficult to analyze the ultimate liability in delay claims. The original schedule (as‐planned) is known, and, likewise, the actual schedule (as‐built) is known. What is unknown is the appropriate schedule when all allowable adjustments to the schedule are taken into account; this schedule is often called the as‐adjusted schedule. This paper presents a tool to aid in analysis of delay claims. The procedure set forth will handle delays and accelerations and will help in determination of the as‐adjusted schedule.
    • Download: (651.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Concurrent Delays in Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/33620
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorZaki M. Kraiem
    contributor authorJames E. Diekmann
    date accessioned2017-05-08T20:58:01Z
    date available2017-05-08T20:58:01Z
    date copyrightDecember 1987
    date issued1987
    identifier other%28asce%290733-9364%281987%29113%3A4%28591%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/33620
    description abstractThe time allowed for construction project performance is usually an important consideration for both the project owner and the project contractor. Yet, it is typical for construction projects to be delayed. Delays may be caused by the owner (compensable delay), by the contractor (nonexcusable delay), by acts of god, or a third party (excusable delay), or several different kinds of delays may happen concurrently. Because of the many sources and causes of construction delays, it is often difficult to analyze the ultimate liability in delay claims. The original schedule (as‐planned) is known, and, likewise, the actual schedule (as‐built) is known. What is unknown is the appropriate schedule when all allowable adjustments to the schedule are taken into account; this schedule is often called the as‐adjusted schedule. This paper presents a tool to aid in analysis of delay claims. The procedure set forth will handle delays and accelerations and will help in determination of the as‐adjusted schedule.
    publisherAmerican Society of Civil Engineers
    titleConcurrent Delays in Construction Projects
    typeJournal Paper
    journal volume113
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1987)113:4(591)
    treeJournal of Construction Engineering and Management:;1987:;Volume ( 113 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian