YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Optimal Strategy Modeling for Price-Time Biparameter Construction Bidding

    Source: Journal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 004
    Author:
    Ming-Lu Wu
    ,
    Hing-Po Lo
    DOI: 10.1061/(ASCE)0733-9364(2009)135:4(298)
    Publisher: American Society of Civil Engineers
    Abstract: In the price-time biparameter construction bidding system, each contractor submits a bid price and construction time to complete the project, which are then aggregated to a total combined bid (TCB) by the client, and the contractor with the lowest TCB is awarded the project. Since bid price can be set as construction cost plus an appropriate markup and construction cost usually depends on construction time, TCB can be expressed as a function of time. By minimizing such a TCB function, the optimal construction time can be obtained, from which the optimal construction cost and bid price and hence the optimal price-time bidding strategy can be sequentially decided. While examining the whole optimal bidding process, this paper focuses on three aspects to enhance the key ideas: discussing the properties of the general and the quadratic time-cost functions, deducing the optimal bidding formulas with quadratic time-cost relationship, and illustrating the procedures for estimating the quadratic time-cost function using a few experience data and the linear regression method. The in-depth examination of the price-time biparameter bidding model in the paper can suggest ideas and methodologies to construction bidding or contractor selection with more criteria.
    • Download: (157.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Optimal Strategy Modeling for Price-Time Biparameter Construction Bidding

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/29220
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMing-Lu Wu
    contributor authorHing-Po Lo
    date accessioned2017-05-08T20:51:03Z
    date available2017-05-08T20:51:03Z
    date copyrightApril 2009
    date issued2009
    identifier other%28asce%290733-9364%282009%29135%3A4%28298%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/29220
    description abstractIn the price-time biparameter construction bidding system, each contractor submits a bid price and construction time to complete the project, which are then aggregated to a total combined bid (TCB) by the client, and the contractor with the lowest TCB is awarded the project. Since bid price can be set as construction cost plus an appropriate markup and construction cost usually depends on construction time, TCB can be expressed as a function of time. By minimizing such a TCB function, the optimal construction time can be obtained, from which the optimal construction cost and bid price and hence the optimal price-time bidding strategy can be sequentially decided. While examining the whole optimal bidding process, this paper focuses on three aspects to enhance the key ideas: discussing the properties of the general and the quadratic time-cost functions, deducing the optimal bidding formulas with quadratic time-cost relationship, and illustrating the procedures for estimating the quadratic time-cost function using a few experience data and the linear regression method. The in-depth examination of the price-time biparameter bidding model in the paper can suggest ideas and methodologies to construction bidding or contractor selection with more criteria.
    publisherAmerican Society of Civil Engineers
    titleOptimal Strategy Modeling for Price-Time Biparameter Construction Bidding
    typeJournal Paper
    journal volume135
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2009)135:4(298)
    treeJournal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian