YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Developing a Traffic Closure Integrated Linear Schedule for Highway Rehabilitation Projects

    Source: Journal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 003
    Author:
    Haribol Sharma
    ,
    Charles McIntyre
    ,
    Zhili Gao
    ,
    Tang-Hung Nguyen
    DOI: 10.1061/(ASCE)0733-9364(2009)135:3(146)
    Publisher: American Society of Civil Engineers
    Abstract: In recent years, the state departments of transportation have implemented a number of highway rehabilitation projects across the country. These projects differ fundamentally from new highway projects in that they require an uninterrupted flow of traffic throughout both the duration and geometric length of the project. Synchronization of traffic closure with the construction activities is crucial in such projects to avoid the traffic conflicts and prevent idle time for equipment and labor. Although most highway rehabilitation projects involve predominantly linear activities, the techniques of linear scheduling are not readily applicable to highway rehabilitation projects due to the conflict between the workzone and traffic flow. This paper documents the development of a traffic closure integrated linear schedule (TCILS) that addresses both traffic closure and work progress issues. The TCILS generates a single schedule for both the construction activities and the associated traffic closures. Visual and graphical features are also applied in the system, which makes it particularly applicable for highway rehabilitation projects. An actual concrete pavement rehabilitation project using the TCILS is presented as a sample of application. The findings from the sample project, although they are limited, show that the TCILS can be applied to an actual project. With recommended future development, the system is believed to be beneficial for both construction practitioners and academics.
    • Download: (1.154Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Developing a Traffic Closure Integrated Linear Schedule for Highway Rehabilitation Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/29052
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorHaribol Sharma
    contributor authorCharles McIntyre
    contributor authorZhili Gao
    contributor authorTang-Hung Nguyen
    date accessioned2017-05-08T20:50:47Z
    date available2017-05-08T20:50:47Z
    date copyrightMarch 2009
    date issued2009
    identifier other%28asce%290733-9364%282009%29135%3A3%28146%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/29052
    description abstractIn recent years, the state departments of transportation have implemented a number of highway rehabilitation projects across the country. These projects differ fundamentally from new highway projects in that they require an uninterrupted flow of traffic throughout both the duration and geometric length of the project. Synchronization of traffic closure with the construction activities is crucial in such projects to avoid the traffic conflicts and prevent idle time for equipment and labor. Although most highway rehabilitation projects involve predominantly linear activities, the techniques of linear scheduling are not readily applicable to highway rehabilitation projects due to the conflict between the workzone and traffic flow. This paper documents the development of a traffic closure integrated linear schedule (TCILS) that addresses both traffic closure and work progress issues. The TCILS generates a single schedule for both the construction activities and the associated traffic closures. Visual and graphical features are also applied in the system, which makes it particularly applicable for highway rehabilitation projects. An actual concrete pavement rehabilitation project using the TCILS is presented as a sample of application. The findings from the sample project, although they are limited, show that the TCILS can be applied to an actual project. With recommended future development, the system is believed to be beneficial for both construction practitioners and academics.
    publisherAmerican Society of Civil Engineers
    titleDeveloping a Traffic Closure Integrated Linear Schedule for Highway Rehabilitation Projects
    typeJournal Paper
    journal volume135
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2009)135:3(146)
    treeJournal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian