YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Delay Analysis within Construction Contracting Organizations

    Source: Journal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 009
    Author:
    Issaka Ndekugri
    ,
    Nuhu Braimah
    ,
    Rod Gameson
    DOI: 10.1061/(ASCE)0733-9364(2008)134:9(692)
    Publisher: American Society of Civil Engineers
    Abstract: Delayed completion of a construction project is often caused by a complex interaction of a combination of events, some of which are the contractor’s risks and others are the project owner’s. The apportionment of the liability to give effect to the risk allocation has therefore been a matter of great controversy. Many delay analysis methodologies have been developed over the years for performing this task. This paper reports on an empirical study into the current practice in the use of these methodologies in the United Kingdom, as part of a wider study aimed at developing a framework for improving delay claims analysis. The part of the study reported here was based on a questionnaire survey of key informants. The issues investigated include the categories of staff within contracting organizations who contribute to delay claims analyses, the awareness, use and reliability of existing delay analysis methods and the obstacles to their use in practice. The main findings of the study are that: (1) the preparation of delay claims often requires input from commercial managers (quantity surveyors), schedulers, site managers, external claim consultants and estimators; (2) commercial managers have the greatest involvement; (3) claims analyzed using the as-built versus as-planned and the impacted as-planned techniques are often successful although there is considerable literature on the shortcomings of these techniques; and (4) the main obstacles to the use of the methods relates to deficiencies in project records and scheduling practice.
    • Download: (162.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Delay Analysis within Construction Contracting Organizations

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/28742
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorIssaka Ndekugri
    contributor authorNuhu Braimah
    contributor authorRod Gameson
    date accessioned2017-05-08T20:50:14Z
    date available2017-05-08T20:50:14Z
    date copyrightSeptember 2008
    date issued2008
    identifier other%28asce%290733-9364%282008%29134%3A9%28692%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/28742
    description abstractDelayed completion of a construction project is often caused by a complex interaction of a combination of events, some of which are the contractor’s risks and others are the project owner’s. The apportionment of the liability to give effect to the risk allocation has therefore been a matter of great controversy. Many delay analysis methodologies have been developed over the years for performing this task. This paper reports on an empirical study into the current practice in the use of these methodologies in the United Kingdom, as part of a wider study aimed at developing a framework for improving delay claims analysis. The part of the study reported here was based on a questionnaire survey of key informants. The issues investigated include the categories of staff within contracting organizations who contribute to delay claims analyses, the awareness, use and reliability of existing delay analysis methods and the obstacles to their use in practice. The main findings of the study are that: (1) the preparation of delay claims often requires input from commercial managers (quantity surveyors), schedulers, site managers, external claim consultants and estimators; (2) commercial managers have the greatest involvement; (3) claims analyzed using the as-built versus as-planned and the impacted as-planned techniques are often successful although there is considerable literature on the shortcomings of these techniques; and (4) the main obstacles to the use of the methods relates to deficiencies in project records and scheduling practice.
    publisherAmerican Society of Civil Engineers
    titleDelay Analysis within Construction Contracting Organizations
    typeJournal Paper
    journal volume134
    journal issue9
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2008)134:9(692)
    treeJournal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 009
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian