YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Relationship between Organizational Sizes and Contractors’ Risk Pricing Behaviors for Weather Risk under Different Project Values and Durations

    Source: Journal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 009
    Author:
    Edwin H. Chan
    ,
    Maria C. Au
    DOI: 10.1061/(ASCE)0733-9364(2008)134:9(673)
    Publisher: American Society of Civil Engineers
    Abstract: A problem that always annoys building employers and their consultants when drafting building contracts is whether it is more cost efficient to retain certain risks with themselves or to transfer the same to contractors, and it has long been a difficulty to accurately estimate the cost for transferring risks to the other contract party. It is a very common market practice to remove contractors’ entitlement to extension of time due to inclement weather, and in view of the significant impacts that inclement weather posed on construction progress, it would be helpful to assess the associated costs for such risk allocation exercises in order to ensure that it is a cost-effective transaction. The costs for these potential weather-caused delays are priced by contractors in their returned tenders. This risk-pricing behavior is affected by the contractor’s risk perception and risk attitude. However, merely working out contractors’ risk perception and risk attitude patterns is inadequate, as they may vary in accordance with different organizational sizes and project backgrounds. Therefore, further studies should be carried out on the implications of project information, such as project value and contract period, on different-sized contractors’ risk behaviors. In this research, a questionnaire survey was conducted to investigate the weather-risk-pricing behavioral patterns of various-sized contractors under different given project scenarios. The survey revealed that the impacts of project value and contract period (and, thus, the intensity of work and scale of exposure to weather risk) were significant on contractors’ risk behaviors, and these impacts varied in accordance with different organizational sizes. The medium-sized contractors’ pricing behaviors were rather constant under different project values and contract periods, while both small and large contractors behaved differently when the intensity of work and scale of risk exposure varied. Despite the fact that contractors of various sizes behaved differently in some given scenarios, the number of days of delaying cost allowed by them in returned tenders were generally less than the actual number of days of inclement weather affecting work.
    • Download: (89.19Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Relationship between Organizational Sizes and Contractors’ Risk Pricing Behaviors for Weather Risk under Different Project Values and Durations

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/28719
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorEdwin H. Chan
    contributor authorMaria C. Au
    date accessioned2017-05-08T20:50:12Z
    date available2017-05-08T20:50:12Z
    date copyrightSeptember 2008
    date issued2008
    identifier other%28asce%290733-9364%282008%29134%3A9%28673%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/28719
    description abstractA problem that always annoys building employers and their consultants when drafting building contracts is whether it is more cost efficient to retain certain risks with themselves or to transfer the same to contractors, and it has long been a difficulty to accurately estimate the cost for transferring risks to the other contract party. It is a very common market practice to remove contractors’ entitlement to extension of time due to inclement weather, and in view of the significant impacts that inclement weather posed on construction progress, it would be helpful to assess the associated costs for such risk allocation exercises in order to ensure that it is a cost-effective transaction. The costs for these potential weather-caused delays are priced by contractors in their returned tenders. This risk-pricing behavior is affected by the contractor’s risk perception and risk attitude. However, merely working out contractors’ risk perception and risk attitude patterns is inadequate, as they may vary in accordance with different organizational sizes and project backgrounds. Therefore, further studies should be carried out on the implications of project information, such as project value and contract period, on different-sized contractors’ risk behaviors. In this research, a questionnaire survey was conducted to investigate the weather-risk-pricing behavioral patterns of various-sized contractors under different given project scenarios. The survey revealed that the impacts of project value and contract period (and, thus, the intensity of work and scale of exposure to weather risk) were significant on contractors’ risk behaviors, and these impacts varied in accordance with different organizational sizes. The medium-sized contractors’ pricing behaviors were rather constant under different project values and contract periods, while both small and large contractors behaved differently when the intensity of work and scale of risk exposure varied. Despite the fact that contractors of various sizes behaved differently in some given scenarios, the number of days of delaying cost allowed by them in returned tenders were generally less than the actual number of days of inclement weather affecting work.
    publisherAmerican Society of Civil Engineers
    titleRelationship between Organizational Sizes and Contractors’ Risk Pricing Behaviors for Weather Risk under Different Project Values and Durations
    typeJournal Paper
    journal volume134
    journal issue9
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2008)134:9(673)
    treeJournal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 009
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian