YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Managing Tipping Point Dynamics in Complex Construction Projects

    Source: Journal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 006
    Author:
    Timothy R. B. Taylor
    ,
    David N. Ford
    DOI: 10.1061/(ASCE)0733-9364(2008)134:6(421)
    Publisher: American Society of Civil Engineers
    Abstract: Complex construction projects are vulnerable to tipping points. Tipping points are conditions that, when crossed, cause system behaviors to radically change performance. Previous research identified tipping point dynamics as capable of explaining the failure of some nuclear power plant construction projects. These dynamics can also threaten the success of other large, complex construction projects. The current work uses a dynamic project model to test policies for managing tipping point dynamics. The Limerick Unit 2 nuclear power plant project is used to test model usefulness. Sensitivity analysis reveals the rework fraction, strength of subsystem interdependence, and sensitivity of the project to schedule pressure as potential high-leverage points for policy design. The model is used to test policies for managing tipping points that were used to complete the Limerick Unit 2 nuclear power plant after a tipping point threatened project completion. Implications for construction project design and management and research opportunities are discussed.
    • Download: (529.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Managing Tipping Point Dynamics in Complex Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/28431
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorTimothy R. B. Taylor
    contributor authorDavid N. Ford
    date accessioned2017-05-08T20:49:44Z
    date available2017-05-08T20:49:44Z
    date copyrightJune 2008
    date issued2008
    identifier other%28asce%290733-9364%282008%29134%3A6%28421%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/28431
    description abstractComplex construction projects are vulnerable to tipping points. Tipping points are conditions that, when crossed, cause system behaviors to radically change performance. Previous research identified tipping point dynamics as capable of explaining the failure of some nuclear power plant construction projects. These dynamics can also threaten the success of other large, complex construction projects. The current work uses a dynamic project model to test policies for managing tipping point dynamics. The Limerick Unit 2 nuclear power plant project is used to test model usefulness. Sensitivity analysis reveals the rework fraction, strength of subsystem interdependence, and sensitivity of the project to schedule pressure as potential high-leverage points for policy design. The model is used to test policies for managing tipping points that were used to complete the Limerick Unit 2 nuclear power plant after a tipping point threatened project completion. Implications for construction project design and management and research opportunities are discussed.
    publisherAmerican Society of Civil Engineers
    titleManaging Tipping Point Dynamics in Complex Construction Projects
    typeJournal Paper
    journal volume134
    journal issue6
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2008)134:6(421)
    treeJournal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian