YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Irrigation and Drainage Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Irrigation and Drainage Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Salt River Project Canal Automation Pilot Project: Simulation Tests

    Source: Journal of Irrigation and Drainage Engineering:;2006:;Volume ( 132 ):;issue: 002
    Author:
    E. Bautista
    ,
    A. J. Clemmens
    ,
    R. J. Strand
    DOI: 10.1061/(ASCE)0733-9437(2006)132:2(143)
    Publisher: American Society of Civil Engineers
    Abstract: The feasibility of automatically controlling water levels and deliveries on the Salt River Project (SRP) canal system through computer-based algorithms is being investigated. The proposed control system automates and enhances functions already performed by SRP operators, namely feedforward routing of scheduled demand changes, feedback control of downstream water levels, and flow control at check structures. Performance of the control system was tested with unsteady flow simulation. Test scenarios were defined by the operators for a 30 km, four-pool canal reach. The tests considered the effect of imperfect knowledge of check gate head-discharge relationships. The combined feedback-feedforward controller easily kept water level deviations close to the target when dealing with routine, scheduled flow changes. Those same routine changes, when unscheduled, were handled effectively by the feedback controller alone. The combined system had greater difficulty in dealing with large demand changes, especially if unscheduled. Because feedback flow changes are computed independently of feedforward changes, the feedback controller tends to counteract feedforward control actions. The effect is unimportant when dealing with routine flow changes but is more significant when dealing with large changes, especially in cases where the demand change cannot be fully anticipated.
    • Download: (348.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Salt River Project Canal Automation Pilot Project: Simulation Tests

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/28417
    Collections
    • Journal of Irrigation and Drainage Engineering

    Show full item record

    contributor authorE. Bautista
    contributor authorA. J. Clemmens
    contributor authorR. J. Strand
    date accessioned2017-05-08T20:49:43Z
    date available2017-05-08T20:49:43Z
    date copyrightApril 2006
    date issued2006
    identifier other%28asce%290733-9437%282006%29132%3A2%28143%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/28417
    description abstractThe feasibility of automatically controlling water levels and deliveries on the Salt River Project (SRP) canal system through computer-based algorithms is being investigated. The proposed control system automates and enhances functions already performed by SRP operators, namely feedforward routing of scheduled demand changes, feedback control of downstream water levels, and flow control at check structures. Performance of the control system was tested with unsteady flow simulation. Test scenarios were defined by the operators for a 30 km, four-pool canal reach. The tests considered the effect of imperfect knowledge of check gate head-discharge relationships. The combined feedback-feedforward controller easily kept water level deviations close to the target when dealing with routine, scheduled flow changes. Those same routine changes, when unscheduled, were handled effectively by the feedback controller alone. The combined system had greater difficulty in dealing with large demand changes, especially if unscheduled. Because feedback flow changes are computed independently of feedforward changes, the feedback controller tends to counteract feedforward control actions. The effect is unimportant when dealing with routine flow changes but is more significant when dealing with large changes, especially in cases where the demand change cannot be fully anticipated.
    publisherAmerican Society of Civil Engineers
    titleSalt River Project Canal Automation Pilot Project: Simulation Tests
    typeJournal Paper
    journal volume132
    journal issue2
    journal titleJournal of Irrigation and Drainage Engineering
    identifier doi10.1061/(ASCE)0733-9437(2006)132:2(143)
    treeJournal of Irrigation and Drainage Engineering:;2006:;Volume ( 132 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian