YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Determinants of Successful Design-Build Projects

    Source: Journal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 005
    Author:
    Edmond W. Lam
    ,
    Albert P. Chan
    ,
    Daniel W. Chan
    DOI: 10.1061/(ASCE)0733-9364(2008)134:5(333)
    Publisher: American Society of Civil Engineers
    Abstract: A construction project is mostly initiated by the needs of the client. In order to satisfy the client’s requirements in terms of time, cost, and quality, various procurement methods are recommended for selection to increase the chance of success for the complex sequence of activities. Design-build (D&B) integrates design and construction to overcome some of the hurdles inherent in the traditional design-bid-build method. It has been extensively used worldwide and its distinctive features are claimed to deal with the problems of the traditional design-bid-build method. An investigation into the determinants of successful D&B projects can therefore help set a benchmark study for industry practitioners to compare their project performance. To better indicate the success level of D&B projects, the writers developed a project success index for D&B projects in the Hong Kong context, which is assessed by the key project performance indicators of time, cost, quality, and functionality. Multiple regression analysis is then applied to show that the project nature, the effective project management action, and the adoption of innovative management approaches are the critical success factors for D&B projects. The identification of success criteria can furnish project participants with indicators to attain success for their D&B projects for benchmarking and control purposes. The predictors for D&B project success were also determined to enrich the knowledge base for the D&B procurement system.
    • Download: (95.28Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Determinants of Successful Design-Build Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/28320
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorEdmond W. Lam
    contributor authorAlbert P. Chan
    contributor authorDaniel W. Chan
    date accessioned2017-05-08T20:49:33Z
    date available2017-05-08T20:49:33Z
    date copyrightMay 2008
    date issued2008
    identifier other%28asce%290733-9364%282008%29134%3A5%28333%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/28320
    description abstractA construction project is mostly initiated by the needs of the client. In order to satisfy the client’s requirements in terms of time, cost, and quality, various procurement methods are recommended for selection to increase the chance of success for the complex sequence of activities. Design-build (D&B) integrates design and construction to overcome some of the hurdles inherent in the traditional design-bid-build method. It has been extensively used worldwide and its distinctive features are claimed to deal with the problems of the traditional design-bid-build method. An investigation into the determinants of successful D&B projects can therefore help set a benchmark study for industry practitioners to compare their project performance. To better indicate the success level of D&B projects, the writers developed a project success index for D&B projects in the Hong Kong context, which is assessed by the key project performance indicators of time, cost, quality, and functionality. Multiple regression analysis is then applied to show that the project nature, the effective project management action, and the adoption of innovative management approaches are the critical success factors for D&B projects. The identification of success criteria can furnish project participants with indicators to attain success for their D&B projects for benchmarking and control purposes. The predictors for D&B project success were also determined to enrich the knowledge base for the D&B procurement system.
    publisherAmerican Society of Civil Engineers
    titleDeterminants of Successful Design-Build Projects
    typeJournal Paper
    journal volume134
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2008)134:5(333)
    treeJournal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian