contributor author | Cheng Zhang | |
contributor author | Tarek Zayed | |
contributor author | Amin Hammad | |
date accessioned | 2017-05-08T20:49:30Z | |
date available | 2017-05-08T20:49:30Z | |
date copyright | May 2008 | |
date issued | 2008 | |
identifier other | %28asce%290733-9364%282008%29134%3A5%28311%29.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/28298 | |
description abstract | The condition and performance of bridges vary widely across North America. The large amount of expenditures on bridges needs significant efforts to optimize budget and resource allocation and to select the best rehabilitation or replacement method, which reduces project cost and duration. Simulation has been widely used in the construction area to optimize productivity and resource allocation. Current research optimizes resource combination for bridge deck rehabilitation projects using discrete event simulation. The Jacques Cartier Bridge redecking project is selected as a case study. Data related to productivity and duration of different activities were collected from the project. Probability distributions are fitted, which show the robustness of normal distribution to fit most variables. A simulation model is developed for this project in order to experiment with and perform sensitivity analysis. Based on the simulation results, an optimum resource combination of deck rehabilitation is obtained, which is [five teams, two saws, three old section trucks, and five new panel trucks] TSON 5235 with the unit (panel) cost of | |
publisher | American Society of Civil Engineers | |
title | Resource Management of Bridge Deck Rehabilitation: Jacques Cartier Bridge Case Study | |
type | Journal Paper | |
journal volume | 134 | |
journal issue | 5 | |
journal title | Journal of Construction Engineering and Management | |
identifier doi | 10.1061/(ASCE)0733-9364(2008)134:5(311) | |
tree | Journal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 005 | |
contenttype | Fulltext | |