YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Problem-Solving Base Building under Uncertainty and Ambiguity: Multiple-Case Study on an Airport Expansion Program

    Source: Journal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 012
    Author:
    Nuno Gil
    ,
    Sara Beckman
    ,
    Iris Tommelein
    DOI: 10.1061/(ASCE)0733-9364(2008)134:12(991)
    Publisher: American Society of Civil Engineers
    Abstract: This multiple-case study induces alternative strategies to coordinate the overlap of tasks to detail and physically execute base building with tasks to conceptualize the business-critical fit out. Base-building subsystems provide service space for occupancy, whereas fit-out subsystems make the space functional. Our empirical findings on problem-solving base-building design under uncertainty and ambiguity stem from a number of projects in an airport expansion program. They suggest that base-building subsystems show low sensitivity to incremental changes in fit out as their definitions are seldom optimized to eliminate slack. Yet, base-building subsystems show high sensitivity to radical changes in fit out when the architectures of the two subsystems are integral to one another. Three strategies for problem-solving base building stand out: (1) iterate design when preliminary information about fit out is ambiguous, or precise but unstable; (2) physically decouple the architectures of base building and fit out; and (3) design buffers in base building when preliminary information about fit out lacks precision but it is not ambiguous. These buffers can be designed out if uncertainties in fit out resolve favorably before starting the physical execution for base building.
    • Download: (156.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Problem-Solving Base Building under Uncertainty and Ambiguity: Multiple-Case Study on an Airport Expansion Program

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/27998
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorNuno Gil
    contributor authorSara Beckman
    contributor authorIris Tommelein
    date accessioned2017-05-08T20:49:05Z
    date available2017-05-08T20:49:05Z
    date copyrightDecember 2008
    date issued2008
    identifier other%28asce%290733-9364%282008%29134%3A12%28991%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/27998
    description abstractThis multiple-case study induces alternative strategies to coordinate the overlap of tasks to detail and physically execute base building with tasks to conceptualize the business-critical fit out. Base-building subsystems provide service space for occupancy, whereas fit-out subsystems make the space functional. Our empirical findings on problem-solving base-building design under uncertainty and ambiguity stem from a number of projects in an airport expansion program. They suggest that base-building subsystems show low sensitivity to incremental changes in fit out as their definitions are seldom optimized to eliminate slack. Yet, base-building subsystems show high sensitivity to radical changes in fit out when the architectures of the two subsystems are integral to one another. Three strategies for problem-solving base building stand out: (1) iterate design when preliminary information about fit out is ambiguous, or precise but unstable; (2) physically decouple the architectures of base building and fit out; and (3) design buffers in base building when preliminary information about fit out lacks precision but it is not ambiguous. These buffers can be designed out if uncertainties in fit out resolve favorably before starting the physical execution for base building.
    publisherAmerican Society of Civil Engineers
    titleProblem-Solving Base Building under Uncertainty and Ambiguity: Multiple-Case Study on an Airport Expansion Program
    typeJournal Paper
    journal volume134
    journal issue12
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2008)134:12(991)
    treeJournal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 012
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian