YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Estimating Cost Discrepancies in Highway Contracts: Multistep Econometric Approach

    Source: Journal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 012
    Author:
    Konstantina Gkritza
    ,
    Samuel Labi
    DOI: 10.1061/(ASCE)0733-9364(2008)134:12(953)
    Publisher: American Society of Civil Engineers
    Abstract: This paper investigates the likelihood of occurrence and quantifies the magnitude and rate of discrepancies in highway project final costs with respect to their contract award amounts. Using data from Indiana, we develop a multistep econometric approach that can be used to estimate the effects of factors associated with the contract bidding process, project type, and the project physical environment on cost discrepancies in highway contracts. Estimation findings indicate that for a given project type and project year, contracts of larger size or longer duration are generally more likely to incur cost overruns. In addition, for contracts that incur cost overruns, the cost overrun rate decreases nonlinearly with increasing contract size up to a certain point after which the cost overrun rate increases with increasing contract size. Our approach allows for the possibility that cost overrun amounts are not linearly related to contract award amounts (contract size), and shows that greater analytical flexibility needs to be incorporated into any investigation of contract cost overruns. Agencies interested in improving their financial forecasts can replicate our proposed methodology using local contract data.
    • Download: (282.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Estimating Cost Discrepancies in Highway Contracts: Multistep Econometric Approach

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/27954
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorKonstantina Gkritza
    contributor authorSamuel Labi
    date accessioned2017-05-08T20:49:01Z
    date available2017-05-08T20:49:01Z
    date copyrightDecember 2008
    date issued2008
    identifier other%28asce%290733-9364%282008%29134%3A12%28953%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/27954
    description abstractThis paper investigates the likelihood of occurrence and quantifies the magnitude and rate of discrepancies in highway project final costs with respect to their contract award amounts. Using data from Indiana, we develop a multistep econometric approach that can be used to estimate the effects of factors associated with the contract bidding process, project type, and the project physical environment on cost discrepancies in highway contracts. Estimation findings indicate that for a given project type and project year, contracts of larger size or longer duration are generally more likely to incur cost overruns. In addition, for contracts that incur cost overruns, the cost overrun rate decreases nonlinearly with increasing contract size up to a certain point after which the cost overrun rate increases with increasing contract size. Our approach allows for the possibility that cost overrun amounts are not linearly related to contract award amounts (contract size), and shows that greater analytical flexibility needs to be incorporated into any investigation of contract cost overruns. Agencies interested in improving their financial forecasts can replicate our proposed methodology using local contract data.
    publisherAmerican Society of Civil Engineers
    titleEstimating Cost Discrepancies in Highway Contracts: Multistep Econometric Approach
    typeJournal Paper
    journal volume134
    journal issue12
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2008)134:12(953)
    treeJournal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 012
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian