YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Analysis of Techniques Leading to Radical Reduction in Project Cycle Time

    Source: Journal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 012
    Author:
    Makarand Hastak
    ,
    Sanjiv Gokhale
    ,
    Kartik Goyani
    ,
    Taehoon Hong
    ,
    Bhavin Safi
    DOI: 10.1061/(ASCE)0733-9364(2008)134:12(915)
    Publisher: American Society of Civil Engineers
    Abstract: Today’s construction business relies on first-to-market product strategies to gain competitive advantages and increase profit margins. This has created an increased demand for a high performance capital project delivery system that can achieve a dramatic reduction in project cycle time. Very few decision tools and guidelines exist to assist owners in choosing appropriate delivery systems and project strategies to radically reduce the project cycle time from the preplanning stage through start up. The research presented in this paper surveyed the construction owners and architectural/engineering/construction firms to identify projects that have achieved greater than 25% reduction in overall project cycle time when compared to current industry standards. The data collected were analyzed to determine the techniques that facilitate radical reduction in project cycle time. These techniques include, best practices and schedule reduction techniques as well as the various management techniques employed on the projects identified by the Construction Industry Institute (CII). This research also identified the barriers to radical schedule reduction. The research concludes that radical schedule reduction well in excess of 25% can be achieved through the selective employment of management techniques, schedule reduction techniques and CII best practices. Almost every construction manager can utilize this research to improve project performance whether for radical reduction or simply more effective execution.
    • Download: (404.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Analysis of Techniques Leading to Radical Reduction in Project Cycle Time

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/27919
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMakarand Hastak
    contributor authorSanjiv Gokhale
    contributor authorKartik Goyani
    contributor authorTaehoon Hong
    contributor authorBhavin Safi
    date accessioned2017-05-08T20:48:58Z
    date available2017-05-08T20:48:58Z
    date copyrightDecember 2008
    date issued2008
    identifier other%28asce%290733-9364%282008%29134%3A12%28915%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/27919
    description abstractToday’s construction business relies on first-to-market product strategies to gain competitive advantages and increase profit margins. This has created an increased demand for a high performance capital project delivery system that can achieve a dramatic reduction in project cycle time. Very few decision tools and guidelines exist to assist owners in choosing appropriate delivery systems and project strategies to radically reduce the project cycle time from the preplanning stage through start up. The research presented in this paper surveyed the construction owners and architectural/engineering/construction firms to identify projects that have achieved greater than 25% reduction in overall project cycle time when compared to current industry standards. The data collected were analyzed to determine the techniques that facilitate radical reduction in project cycle time. These techniques include, best practices and schedule reduction techniques as well as the various management techniques employed on the projects identified by the Construction Industry Institute (CII). This research also identified the barriers to radical schedule reduction. The research concludes that radical schedule reduction well in excess of 25% can be achieved through the selective employment of management techniques, schedule reduction techniques and CII best practices. Almost every construction manager can utilize this research to improve project performance whether for radical reduction or simply more effective execution.
    publisherAmerican Society of Civil Engineers
    titleAnalysis of Techniques Leading to Radical Reduction in Project Cycle Time
    typeJournal Paper
    journal volume134
    journal issue12
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2008)134:12(915)
    treeJournal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 012
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian