YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Simulation of Concrete Paving Operations on Interstate-74

    Source: Journal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 001
    Author:
    Marwa M. Hassan
    ,
    Stan Gruber
    DOI: 10.1061/(ASCE)0733-9364(2008)134:1(2)
    Publisher: American Society of Civil Engineers
    Abstract: The objective of this paper was to study and optimize the concrete paving operations taking place in the reconstruction project of Interstate-74 using computer simulation. To achieve this objective, field data were collected during construction, and were then used to determine adequate probabilistic density functions for the activities’ duration and to test a developed simulation model. Upon testing, the developed model was used to study the impacts of resources on the flow of operations and on the cost effectiveness of the construction process. In general, application of simulation methods to concrete paving operations was successful and its accuracy was acceptable as compared to field measurements. Based on the results of a sensitivity analysis of the critical resources, multiple factors were considered in the decision-making process to ensure that all aspects of the operation are evaluated. This includes total operation time, productivity, costs of the operation, average truck delay, and idle times for the paver and the spreader. For the conditions pertinent to this construction site, ten trucks, one paver and one spreader, and three finishing and plastic-covering crews are recommended. Using this set of resources would result in a prompt and effective execution of the operation. Practical implementation and limitations of the developed model in similar construction operations is discussed.
    • Download: (766.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Simulation of Concrete Paving Operations on Interstate-74

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/27608
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMarwa M. Hassan
    contributor authorStan Gruber
    date accessioned2017-05-08T20:48:03Z
    date available2017-05-08T20:48:03Z
    date copyrightJanuary 2008
    date issued2008
    identifier other%28asce%290733-9364%282008%29134%3A1%282%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/27608
    description abstractThe objective of this paper was to study and optimize the concrete paving operations taking place in the reconstruction project of Interstate-74 using computer simulation. To achieve this objective, field data were collected during construction, and were then used to determine adequate probabilistic density functions for the activities’ duration and to test a developed simulation model. Upon testing, the developed model was used to study the impacts of resources on the flow of operations and on the cost effectiveness of the construction process. In general, application of simulation methods to concrete paving operations was successful and its accuracy was acceptable as compared to field measurements. Based on the results of a sensitivity analysis of the critical resources, multiple factors were considered in the decision-making process to ensure that all aspects of the operation are evaluated. This includes total operation time, productivity, costs of the operation, average truck delay, and idle times for the paver and the spreader. For the conditions pertinent to this construction site, ten trucks, one paver and one spreader, and three finishing and plastic-covering crews are recommended. Using this set of resources would result in a prompt and effective execution of the operation. Practical implementation and limitations of the developed model in similar construction operations is discussed.
    publisherAmerican Society of Civil Engineers
    titleSimulation of Concrete Paving Operations on Interstate-74
    typeJournal Paper
    journal volume134
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2008)134:1(2)
    treeJournal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian