YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    LEAPCON: Simulation of Lean Construction of High-Rise Apartment Buildings

    Source: Journal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 007
    Author:
    R. Sacks
    ,
    A. Esquenazi
    ,
    M. Goldin
    DOI: 10.1061/(ASCE)0733-9364(2007)133:7(529)
    Publisher: American Society of Civil Engineers
    Abstract: A lean model has been proposed for the construction management of high-rise apartment buildings with customized apartment designs. It incorporates a number of changes to traditional management practice, including single-piece flow with pull scheduling, work restructuring, and multiskilling. A simulated construction process scenario was devised for experimental evaluation of the model. The simulation was first implemented as a live management game, in which participants played the roles of the clients, general contractor, and subcontractors. Eleven runs with different teams indicated that the lean model increased throughput, improved cash flow, and reduced apartment delivery cycle time. However, the limitations of the live simulation led the writers to implement a discrete event computer simulation of the same process. The computer simulation reinforced the findings of the live simulation and emphasized the specific beneficial effect of single-piece flow under pull scheduling. The lean model may be of immediate interest to construction planners and managers because it enables full customization with minimal waste and no additional resources. The demonstrative clarity of the lean model simulation, both live and computerized, makes it a powerful tool for education and research.
    • Download: (457.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      LEAPCON: Simulation of Lean Construction of High-Rise Apartment Buildings

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/27331
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorR. Sacks
    contributor authorA. Esquenazi
    contributor authorM. Goldin
    date accessioned2017-05-08T20:47:35Z
    date available2017-05-08T20:47:35Z
    date copyrightJuly 2007
    date issued2007
    identifier other%28asce%290733-9364%282007%29133%3A7%28529%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/27331
    description abstractA lean model has been proposed for the construction management of high-rise apartment buildings with customized apartment designs. It incorporates a number of changes to traditional management practice, including single-piece flow with pull scheduling, work restructuring, and multiskilling. A simulated construction process scenario was devised for experimental evaluation of the model. The simulation was first implemented as a live management game, in which participants played the roles of the clients, general contractor, and subcontractors. Eleven runs with different teams indicated that the lean model increased throughput, improved cash flow, and reduced apartment delivery cycle time. However, the limitations of the live simulation led the writers to implement a discrete event computer simulation of the same process. The computer simulation reinforced the findings of the live simulation and emphasized the specific beneficial effect of single-piece flow under pull scheduling. The lean model may be of immediate interest to construction planners and managers because it enables full customization with minimal waste and no additional resources. The demonstrative clarity of the lean model simulation, both live and computerized, makes it a powerful tool for education and research.
    publisherAmerican Society of Civil Engineers
    titleLEAPCON: Simulation of Lean Construction of High-Rise Apartment Buildings
    typeJournal Paper
    journal volume133
    journal issue7
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2007)133:7(529)
    treeJournal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 007
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian