YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Budgeting Owner’s Construction Contingency

    Source: Journal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 007
    Author:
    Suat Günhan
    ,
    David Arditi
    DOI: 10.1061/(ASCE)0733-9364(2007)133:7(492)
    Publisher: American Society of Civil Engineers
    Abstract: This paper attempts to find ways to reduce an owner’s construction contingency budget such that just enough contingency is allocated that will allow the owner to deal with uncertainties but at the same time not tie up valuable funds that can be used for other activities. It is suggested that the common practice of allocating a fixed owner contingency (e.g., 10% of the contract value) to all projects contracted out by an owner is not appropriate. Instead, a methodology is proposed whereby the owner (1) analyzes historical project data; (2) identifies the line items that are problematic; (3) takes the necessary measures at the preconstruction stage to streamline these line items with respect to site conditions, time constraints, constructability issues, and project scope; and (4) finally budgets contingency funds based on this information. A case study was conducted to analyze the contingencies budgeted and actually spent by an owner in nine parking lot projects. The findings indicated that a systematic approach such as the methodology proposed in this paper is likely to minimize the owner’s contingency budget.
    • Download: (109.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Budgeting Owner’s Construction Contingency

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/27287
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorSuat Günhan
    contributor authorDavid Arditi
    date accessioned2017-05-08T20:47:30Z
    date available2017-05-08T20:47:30Z
    date copyrightJuly 2007
    date issued2007
    identifier other%28asce%290733-9364%282007%29133%3A7%28492%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/27287
    description abstractThis paper attempts to find ways to reduce an owner’s construction contingency budget such that just enough contingency is allocated that will allow the owner to deal with uncertainties but at the same time not tie up valuable funds that can be used for other activities. It is suggested that the common practice of allocating a fixed owner contingency (e.g., 10% of the contract value) to all projects contracted out by an owner is not appropriate. Instead, a methodology is proposed whereby the owner (1) analyzes historical project data; (2) identifies the line items that are problematic; (3) takes the necessary measures at the preconstruction stage to streamline these line items with respect to site conditions, time constraints, constructability issues, and project scope; and (4) finally budgets contingency funds based on this information. A case study was conducted to analyze the contingencies budgeted and actually spent by an owner in nine parking lot projects. The findings indicated that a systematic approach such as the methodology proposed in this paper is likely to minimize the owner’s contingency budget.
    publisherAmerican Society of Civil Engineers
    titleBudgeting Owner’s Construction Contingency
    typeJournal Paper
    journal volume133
    journal issue7
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2007)133:7(492)
    treeJournal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 007
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian