YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Project Manager’s Decision Aid for a Radical Project Cycle Reduction

    Source: Journal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 006
    Author:
    Makarand Hastak
    ,
    Sanjiv Gokhale
    ,
    Kartik Goyani
    ,
    TaeHoon Hong
    ,
    Bhavin Safi
    DOI: 10.1061/(ASCE)0733-9364(2007)133:6(437)
    Publisher: American Society of Civil Engineers
    Abstract: Currently there are no formal decision tools or guidelines to assist owners and project managers in choosing delivery systems and project strategies that would allow significant reductions in the project cycle time. The development of a decision aid that would allow a project manager to prioritize and apply project cycle reduction techniques would be a valuable tool for achieving project cycle time reduction in projects. This paper presents a new high performance project delivery system called “project manager’s game planner” (PMGP) designed to assist a decision maker in identifying and utilizing an optimal set of radical reduction techniques (RRTs) with the greatest potential for success in achieving cycle time reduction. Additionally, the PMGP can assist the user in identifying the top RRTs during any of the five project phases: preproject planning, design, material management, construction, and start-up. Most projects can utilize this PMGP to improve the project performance whether to achieve significant cycle time reduction or to simply achieve effective project execution.
    • Download: (2.487Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Project Manager’s Decision Aid for a Radical Project Cycle Reduction

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/27231
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMakarand Hastak
    contributor authorSanjiv Gokhale
    contributor authorKartik Goyani
    contributor authorTaeHoon Hong
    contributor authorBhavin Safi
    date accessioned2017-05-08T20:47:24Z
    date available2017-05-08T20:47:24Z
    date copyrightJune 2007
    date issued2007
    identifier other%28asce%290733-9364%282007%29133%3A6%28437%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/27231
    description abstractCurrently there are no formal decision tools or guidelines to assist owners and project managers in choosing delivery systems and project strategies that would allow significant reductions in the project cycle time. The development of a decision aid that would allow a project manager to prioritize and apply project cycle reduction techniques would be a valuable tool for achieving project cycle time reduction in projects. This paper presents a new high performance project delivery system called “project manager’s game planner” (PMGP) designed to assist a decision maker in identifying and utilizing an optimal set of radical reduction techniques (RRTs) with the greatest potential for success in achieving cycle time reduction. Additionally, the PMGP can assist the user in identifying the top RRTs during any of the five project phases: preproject planning, design, material management, construction, and start-up. Most projects can utilize this PMGP to improve the project performance whether to achieve significant cycle time reduction or to simply achieve effective project execution.
    publisherAmerican Society of Civil Engineers
    titleProject Manager’s Decision Aid for a Radical Project Cycle Reduction
    typeJournal Paper
    journal volume133
    journal issue6
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2007)133:6(437)
    treeJournal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian