description abstractMuch of the project scheduling literature treats task durations as deterministic. In reality, however, task durations are subject to considerable uncertainty, and that uncertainty can be influenced by the resources assigned. The purpose of this paper is to provide the means for contractors to optimally allocate their skilled workers among individual tasks for a single project. Instead of the traditional use of
publisherAmerican Society of Civil Engineers
titleProject Planning for Construction under Uncertainty with Limited Resources
typeJournal Paper
journal volume133
journal issue4
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2007)133:4(268)
treeJournal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record