YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Management of Daily Progress in a Construction Project of Multiple Apartment Buildings

    Source: Journal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 003
    Author:
    Yong-Cheol Yang
    ,
    Chan-Jung Park
    ,
    Ju-Hyung Kim
    ,
    Jae-Jun Kim
    DOI: 10.1061/(ASCE)0733-9364(2007)133:3(242)
    Publisher: American Society of Civil Engineers
    Abstract: This paper presents the methods used and a case study of a project management system (PMS) to manage daily progress in the construction of multiple apartment buildings in South Korea. A dilemma encountered in previous research in the field of progress management is that efforts to enhance data accuracy cause the data handling workload to soar. A main feature of the method presented by the writers for calculating the budgeted cost work schedule is to allocate the project budget into control attributes, activities, and tasks that are defined in a work-packaging model, according to daily weight value. The method offers enhanced practicability by reducing data-handling workloads while not sacrificing the rationale of progress management. The work-packaging model is designed to enable project managers to acquire and process data for progress management at various levels of detail. The budgeted cost of work performed is measured daily at the tasks level using the earning percentage rate from daily work reports. The implementation of PMS focuses on functions to distribute the budget according to daily weight values and acquire the earning percentage from the daily work report. The PMS was applied to a construction project of 54 apartment buildings in South Korea. The case study of its use shows that company headquarters and managers in the field can acquire data for progress management without additional data-handling workloads, and can analyze the progress daily at various levels of detail.
    • Download: (1.954Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Management of Daily Progress in a Construction Project of Multiple Apartment Buildings

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/27009
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorYong-Cheol Yang
    contributor authorChan-Jung Park
    contributor authorJu-Hyung Kim
    contributor authorJae-Jun Kim
    date accessioned2017-05-08T20:46:59Z
    date available2017-05-08T20:46:59Z
    date copyrightMarch 2007
    date issued2007
    identifier other%28asce%290733-9364%282007%29133%3A3%28242%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/27009
    description abstractThis paper presents the methods used and a case study of a project management system (PMS) to manage daily progress in the construction of multiple apartment buildings in South Korea. A dilemma encountered in previous research in the field of progress management is that efforts to enhance data accuracy cause the data handling workload to soar. A main feature of the method presented by the writers for calculating the budgeted cost work schedule is to allocate the project budget into control attributes, activities, and tasks that are defined in a work-packaging model, according to daily weight value. The method offers enhanced practicability by reducing data-handling workloads while not sacrificing the rationale of progress management. The work-packaging model is designed to enable project managers to acquire and process data for progress management at various levels of detail. The budgeted cost of work performed is measured daily at the tasks level using the earning percentage rate from daily work reports. The implementation of PMS focuses on functions to distribute the budget according to daily weight values and acquire the earning percentage from the daily work report. The PMS was applied to a construction project of 54 apartment buildings in South Korea. The case study of its use shows that company headquarters and managers in the field can acquire data for progress management without additional data-handling workloads, and can analyze the progress daily at various levels of detail.
    publisherAmerican Society of Civil Engineers
    titleManagement of Daily Progress in a Construction Project of Multiple Apartment Buildings
    typeJournal Paper
    journal volume133
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2007)133:3(242)
    treeJournal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian