| contributor author | Thomas J. Trout | |
| contributor author | Bruce E. Mackey | |
| date accessioned | 2017-05-08T20:46:54Z | |
| date available | 2017-05-08T20:46:54Z | |
| date copyright | May 1988 | |
| date issued | 1988 | |
| identifier other | %28asce%290733-9437%281988%29114%3A2%28256%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/26961 | |
| description abstract | Furrow infiltration and channel seepage are often measured with inflow‐outflow measurements. Inaccuracy in the flow measurement will cause a larger uncertainty in the calculated infiltration. The infiltration rate determination uncertainty increases rapidly as the percent of the inflow that is infiltrated decreases. The effect of measurement uncertainty on infiltration measurements can be estimated so that the confidence interval of a mean or the actual infiltration variability level can be determined. | |
| publisher | American Society of Civil Engineers | |
| title | Inflow‐Outflow Infiltration Measurement Accuracy | |
| type | Journal Paper | |
| journal volume | 114 | |
| journal issue | 2 | |
| journal title | Journal of Irrigation and Drainage Engineering | |
| identifier doi | 10.1061/(ASCE)0733-9437(1988)114:2(256) | |
| tree | Journal of Irrigation and Drainage Engineering:;1988:;Volume ( 114 ):;issue: 002 | |
| contenttype | Fulltext | |