YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Application of Linear Scheduling

    Source: Journal of Construction Engineering and Management:;1986:;Volume ( 112 ):;issue: 004
    Author:
    Edmund N. Chrzanowski, Jr.
    ,
    David W. Johnston
    DOI: 10.1061/(ASCE)0733-9364(1986)112:4(476)
    Publisher: American Society of Civil Engineers
    Abstract: Many projects, such as the construction of roadways, pipelines, and high‐rise buildings, involve repetitive activities. A method for scheduling such work, the Linear Scheduling Method (LSM) is presented. In an LSM schedule, the repetitive activities are plotted as lines of constant or varying slopes on two axes, distance versus time. Discrete activities may be shown at their appropriate times and locations and then referenced to a network schedule for additional detail. The Linear Scheduling Method is illustrated by applying it to an actual roadway construction project. The simplicity of the system and advantages for certain types of projects are revealed. A sample schedule is used to derive information that is comparable to what may be obtained from an equivalent CPM network.
    • Download: (933.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Application of Linear Scheduling

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/26953
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorEdmund N. Chrzanowski, Jr.
    contributor authorDavid W. Johnston
    date accessioned2017-05-08T20:46:53Z
    date available2017-05-08T20:46:53Z
    date copyrightDecember 1986
    date issued1986
    identifier other%28asce%290733-9364%281986%29112%3A4%28476%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/26953
    description abstractMany projects, such as the construction of roadways, pipelines, and high‐rise buildings, involve repetitive activities. A method for scheduling such work, the Linear Scheduling Method (LSM) is presented. In an LSM schedule, the repetitive activities are plotted as lines of constant or varying slopes on two axes, distance versus time. Discrete activities may be shown at their appropriate times and locations and then referenced to a network schedule for additional detail. The Linear Scheduling Method is illustrated by applying it to an actual roadway construction project. The simplicity of the system and advantages for certain types of projects are revealed. A sample schedule is used to derive information that is comparable to what may be obtained from an equivalent CPM network.
    publisherAmerican Society of Civil Engineers
    titleApplication of Linear Scheduling
    typeJournal Paper
    journal volume112
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1986)112:4(476)
    treeJournal of Construction Engineering and Management:;1986:;Volume ( 112 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian